This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
Shalom Regency
Units
21 units
Mix
21 × Residential
Carpet area
15–50 sq mper-unit range, as filed
Floors
9
Parking
1 spaces
Land area
500 sq m
Sanctioned built-up
750 sq m
Timeline
RERA registeredAug 2017
Proposed completionSep 2019
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
21 units across 8 batches
TypeArea sq mCount
Residential248
Residential442
Residential171
Residential151
Residential504
Residential232
Residential212
Residential331
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.9 km · Uran Koproli RoadPrimary road 626 m · Panvel Uran RoadRailway line 427 m · Uran LineRailway station 730m away (Uran City)Bus stop within 500m
Water & environment
River 380 mWater body 649 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹30,017per sq yd
₹35,900per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Uran”.
In force
2026-2027 schedule
Spread
₹23,913 – ₹44,315 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
1,895 residential projects still under way within 25 km. Step out ring by ring:
Of the 244 projects the radar draws within 6 km — every kind, every stage — 60 are residential projects still under way. This list keeps only those, and looks further out.
26 projects within 1 km — showing the nearest 6.
130 m awayOthers
SHREE GANESH RESIDENCY
RAJ HOMES · Bokadvira · Uran
4 yr 8 mo
Oct 2023registered
Jun 2028target completion
Government Guidance Rate₹19,315/sq ydScale58 flatsAuthorityMahaRERA