HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

ZILLION TOWER ONE

P52000046265 · MahaRERA · https://gethorizon.in/projects/zillion-tower-one-bokadvira-uran-lqtxp03d

01

Complete project overview

MahaRERA · Registration filing
Floors
15
Parking
42 spaces
Land area
1,250 sq m
Sanctioned built-up
4,524 sq m

Timeline

RERA registeredJun 2022
Proposed completionMay 2027
TodaySep 2026
Construction progress
Podiums0%
Internal finishes0%
Flat fit-out0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Water conservation…0%
Electrical meter r…0%
Superstructure10%
Stairs & lifts30%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

RAJAL INFRA LLP

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 9 new projects last year
  • 243 nearby projects
1 km radius · coordinates as filed · 18.8644, 72.9570 · © OpenStreetMap contributors
Village
Bokadvira
Taluka
Uran
District
Raigarh
Pincode
400702
Survey no.
PLOT NO 52
North boundary
PLOT NO 51
East boundary
PROP 15 MTR WIDE ROAD
South boundary
PLOT NO 53
West boundary
PLOT NO 56 57 AND 58
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.0km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 4.2 km · Uran Koproli RoadPrimary road 1.2 kmRailway line 1.5 kmRailway station 1.6km away (Uran City)Limited bus connectivity nearby
Water & environment
River 471 mWater body 590 m
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

No building detected within ~20 m of the recorded location in any year from 2016 to 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Feb 2017
Feb 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹19,315per sq yd
₹23,100per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Bokadvira”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
07

Other projects nearby

The register · within 25 km

1,855 residential and mixed-use projects still under way within 25 km. Step out ring by ring:

Of the 243 projects the radar draws within 6 km — every kind, every stage — 64 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.

12 projects within 1 km — showing the nearest 6.

670 m awayMixed

Villa Uptown

Majestic City Constructions · Bokadvira · Uran

Aug 2025registered
Dec 2029target completion
Government Guidance Rate₹19,315/sq ydScale34 flatsAuthorityMahaRERA
690 m awayResidential / Group Housing

Surana Harmony

MDS ENTERPRISES (INDIA) PRIVATE LIMITED · Bokadvira · Uran

Jun 2025registered
Dec 2031target completion
Government Guidance Rate₹19,315/sq ydScale19 flatsAuthorityMahaRERA
750 m awayOthers

Rudra Bhalchandra

Sitaram Janardan Hudar · Chanje · Uran

Jan 2025registered
Feb 2029target completion
Scale74 flatsAuthorityMahaRERA
750 m awayResidential / Group Housing

Planet Bayfront Residences 2

PLANETNOVA CITY LLP · Chanje · Uran

Nov 2025registered
Dec 2034target completion
Scale106 flatsAuthorityMahaRERA
750 m awayResidential / Group Housing

Santosh Planet

PLANETNOVA Developments LLP · Chanje · Uran

Jul 2026registered
Dec 2033target completion
Scale93 flatsAuthorityMahaRERA
900 m awayOthers

SKY FLORA

SKY CITY DEVELOPERS · Bokadvira · Uran

Jul 2024registered
Dec 2027target completion
Government Guidance Rate₹19,315/sq ydScale80 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/zillion-tower-one-bokadvira-uran-lqtxp03d.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.