Yes — registered under affordable housingprice caps & eligibility apply
Timeline
Project startedJan 2015
RERA registeredNov 2017
Proposed completionJun 2021
TodaySep 2026
Construction progress
100% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
221 units across 1 batch
TypeArea sq mCount
Mixed49221
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Ahmedabad Municipal CorporationMunicipal / Corporationthis project2 of 4 projects
Surat Municipal CorporationMunicipal / Corporation1 of 4 projects
Surat Urban Development AuthorityUrban Development Authority1 of 4 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 90 m · Sardar Patel Ring RoadPrimary road 1.7 km · Ahmedabad-Mehmdavad-Nadiad RoadRailway line 3.7 kmRailway station 3.7km away (Vatva)Limited bus connectivity nearby
Water & environment
Water body 514 mCanal 2.6 km · Kharicut Canal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹39.10 Cr declared to build 221 flats. What that works out to:
₹3.90 Lakh – ₹27.74 Lakhdeclared unit pricerange on the filing — not a live asking price
₹17.69 Lakhdeclared cost per flatall-in — land + construction
8%of the cost is land₹619/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹7,316per sq yd
₹8,750per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for “RAMOL”.
In force
2011 schedule
Spread
₹4,808 – ₹8,570 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
GujRERA · Approved building plan
Ahmedabad Municipal Corporation
Municipal / Corporation
Building Permitapproved 16 Nov 2017 · 8 yrs ago
The promised possession date (30 Jun 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Building-Use (BU) permission — the occupancy sign-off, on record
All 3 blocks carry a Building-Use (BU) permission (latest 7 Aug 2019)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The approving body, at scale
Ahmedabad Municipal Corporation
Municipal Corporation
Has approved 3,250 RERA projects — about 1 in 5 in Gujarat, more than any other body in the state.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
2,712
On record
4,25,177 flats · 633 plots
Reach
6 talukas
Since
2007
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,488 residential projects still under way within 25 km. Step out ring by ring:
Of the 745 projects the radar draws within 6 km — every kind, every stage — 283 are residential projects still under way. This list keeps only those, and looks further out.