HORIZON
Share

MUKHI RESIDENCY

PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA02266/EX1/190219 · GujRERA · https://gethorizon.in/projects/mukhi-residency-ahmedabad-city-uls0qux9

01

Complete project overview

GujRERA · Registration filing
Units
220 units
Mix
220 × Residential Flats
Carpet area
35–63 sq mper-unit range, as filed
Blocks
11
Land area
6,176 sq m
Affordable housing
Yes — registered under affordable housingprice caps & eligibility apply

Timeline

Project startedJul 2013
RERA registeredApr 2018
Proposed completionSep 2019
TodaySep 2026
Construction progress

100% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

220 units across 1 batch
TypeArea sq mCount
Residential Flats33220

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

MUKHI CORPORATION

PARTNERSHIP FIRMPromoter type
Ahmedabad, GujaratBased in
1Projects
1City
2018–2019Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Ahmedabad City
District
Ahmedabad
Pincode
382449
Address
MUKHI RESIDENCY, OPP AMC WATER TANKRAMOL, VATVA
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.6km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 747 mPrimary road 1.8 km · Ahmedabad-Mehmdavad-Nadiad RoadRailway line 3.5 kmRailway station 3.7km away (Vatva)Limited bus connectivity nearby
Water & environment
Water body 567 mCanal 1.8 km · Kharicut Canal
distances only — not a flood assessment
Land, title & encumbrance
Mortgage220 unit(s) mortgaged to State Bank of India · ₹2.57 Cr outstanding
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price

₹31.88 Cr declared to build 220 flats. What that works out to:

₹9.00 Lakh – ₹20.80 Lakhdeclared unit pricerange on the filing — not a live asking price
₹14.49 Lakhdeclared cost per flatall-in — land + construction
14%of the cost is land₹673/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

₹5,978per sq yd
₹7,150per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for “VATVA”.
In force
2011 schedule
Spread
₹4,682₹7,525 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

GujRERA · Approved building plan

Ahmedabad Municipal Corporation

Municipal / Corporation
Building Permitapproved 5 Apr 2018 · 8 yrs ago

The promised possession date (30 Sep 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

Building-Use (BU) permission — the occupancy sign-off, on record

All 11 blocks carry a Building-Use (BU) permission (latest 30 Sep 2019)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.

The approving body, at scale

Ahmedabad Municipal Corporation

Municipal Corporation

Has approved 3,250 RERA projectsabout 1 in 5 in Gujarat, more than any other body in the state.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
2,712
On record
4,25,177 flats · 633 plots
Reach
6 talukas
Since
2007

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by GujRERA

07

Other projects nearby

The register · within 25 km

2,513 residential projects still under way within 25 km. Step out ring by ring:

Of the 859 projects the radar draws within 6 km — every kind, every stage — 307 are residential projects still under way. This list keeps only those, and looks further out.

24 projects within 1 km — showing the nearest 6.

310 m awayMixed Development

RIYAL RESIDENCY

RUDRA INFRASTRUCTURE · Vatva

Mar 2024registered
Aug 2028target completion
Price band₹9.15 Lakh–₹85.00 LakhScale432 flatsAuthorityGujRERA
480 m awayResidential/Group Housing

Bagh-E-Farid Luxuria

Royal Infra · Daskroi

Feb 2026registered
Dec 2031target completion
Price band₹22.95 Lakh–₹34.75 LakhScale234 flatsAuthorityGujRERA
570 m awayMixed Development

ROYAL RIYAZ RESIDENCY

AAI SHREE KHODIYAR CONSTRUCTION · Daskroi

Oct 2024registered
Oct 2028target completion
Price band₹2.20 Lakh–₹22.80 LakhScale225 flatsAuthorityGujRERA
610 m awayResidential/Group Housing

Radhe Greens

NAND DEVELOPERS · Ahmedabad City

Apr 2023registered
Dec 2027target completion
Price band₹29.50 Lakh–₹44.75 LakhScale216 flatsAuthorityGujRERA
620 m awayResidential/Group Housing

SHIVAM 84

SHIVAM CORPORATION · Daskroi

Jul 2025registered
Mar 2028target completion
Price band₹18.45 Lakh–₹30.24 LakhScale84 flatsAuthorityGujRERA
700 m awayMixed Development

Signore Sommet

SAMARPAN INFRA · Daskroi

Sep 2025registered
Aug 2029target completion
Price band₹11.70 Lakh–₹67.50 LakhScale124 flatsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.