Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
194 units across 1 batch
TypeArea sq mCount
Shop33194
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
T.P. 26 (Singanpore),F.P 49,R.S No.41/1,42,47 and 99Opp. D-Mart, Cause Way Road,Singanpore,Surat.
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 741m away · 5 clinics within 1km
LifestylePark 1.3km away
ShoppingNo supermarket within 2km
Getting around
Expressway 2.5 km · Swami Parmanand Road FlyoverPrimary road 1.1 kmRailway line 3.7 km · Mumbai - Delhi RailwayMetro station 2.7km away (Ugat Vaarigruh)Limited bus connectivity nearby
Water & environment
River 846 m · Tapi
distances only — not a flood assessment
Land, title & encumbrance
Mortgage194 unit(s) mortgaged to SURAT PEOPLE CO OP BANK · ₹6.70 Cr outstanding
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹22.75 Cr declared to build 194 flats. What that works out to:
₹5.75 Lakh – ₹39.57 Lakhdeclared unit pricerange on the filing — not a live asking price
₹11.73 Lakhdeclared cost per flatall-in — land + construction
₹3,332/sq ftof carpet area₹35,868/sq m
21%of the cost is land₹1,215/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~34 m of the recorded location until 2018; a building is first visible in 2019 and is about 28 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~34 m of the filed location.
Satellite photographs of the same ground
Mar 2017Mar 2023Jan 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2019.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~34 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Gujarat registration department
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
No government guidance rate is shown for this project.
Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
GujRERA · Approved building plan
Surat Municipal Corporation
Municipal / Corporation
Building Permitapproved 19 Mar 2018 · 8 yrs ago
The promised possession date (31 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Building-Use (BU) permission — the occupancy sign-off, on record
All 1 block carry a Building-Use (BU) permission (latest 24 Sep 2021)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The approving body, at scale
Surat Municipal Corporation
Municipal Corporation
Has approved 1,566 RERA projects — about 1 in 11 in Gujarat.
an apartments market — 85% apartments · 15% plotted layouts. Apartments like yours are this body's core business.
Builders
1,275
On record
2,64,009 flats · 16,727 plots
Reach
8 talukas
Since
2005
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
182 commercial projects still under way within 25 km. Step out ring by ring:
Of the 781 projects the radar draws within 6 km — every kind, every stage — 48 are commercial projects still under way. This list keeps only those, and looks further out.
12 projects between 1 and 3 km — showing the nearest 6.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Gujarat's published schedules.
06Planning authority
GujRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
GujRERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/shree-nilkanth-business-hub-surat-city-3a7wjtah.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.