The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
ORERA · Registration filing
District
Dhenkanal
Pincode
759001
What’s nearby
SchoolsNearest school 1.5km away · College or university 1.5km away
HealthcareHospital 296m away · 3 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.5km away
ShoppingSupermarket 371m away
Getting around
Expressway 2.5 kmPrimary road 345 m · Sambalpur,Anugul,Dhenkanal,Cuttack ROAD(NH-55)Railway line 479 mRailway station 1.5km away (Dhenkanal)Limited bus connectivity nearby
Water & environment
Water body 1.0 kmCanal 1.9 kmRiver 2.1 km · Bara Jora
distances only — not a flood assessment
Land, title & encumbrance
Land parcels3 parcels · 668 sq m total
Land tenure3 of 3 parcels held under a Power of Attorney / development agreement — not a registered sale deed to the promoter
VillagesDhenkanal Town, Dhenkanal Town (Nijagada)
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Odisha registration department
In Odisha it’s called the benchmark value.
No government guidance rate is shown for this project.
Odisha's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
ORERA · Approved building plan
Dhenkanal Regional Improvement Trust
Building Permit
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Dhenkanal Regional Improvement Trust
Planning authority
Has approved 8 RERA projects — 0.7% of Odisha.
a mixed market — 38% apartments · 62% plotted layouts.
Builders
5
On record
103 flats · 154 plots
Reach
2 pincodes
Since
2021
More layout-heavy than Odisha overall — 62% plots here vs 13% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. ORERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to ORERA
Litigation
None declared in this filing
Only what the builder declared, or what ORERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with ORERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within Dhenkanal
4 residential projects still under way within Dhenkanal. Step out ring by ring:
Of the 6 projects the radar draws within 6 km — every kind, every stage — 2 are residential projects still under way. This list keeps only those, and looks further out.
2 projects within 25 km — showing the nearest 2.
1.1 km awayResidential
MANORAMA ENCLAVE
DWARKA BUILDERS · Dhenkanal
PossessionMar 2027Scale40 flatsRegistrationvalid to Feb 2027