This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
SRI SRI RESIDENCY
Units
158 units
Floors
16
Buildings
2
Parking
121 spaces
Land area
2,500 sq m
Sanctioned built-up
9,037 sq m
Recreational open space
250 sq m
Timeline
RERA registeredFeb 2021
Proposed completionJun 2024
TodaySep 2026
Complete project overview — done
02
Builder’s track record
MahaRERA · Builder registration
SRI SRI BUILDERS AND DEVELOPERS PROPRIETOR VIJAY KISANLAL AGARWAL
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.2km away · College or university 1.2km away · Library 1.6km away
HealthcareHospital 565m away · 3 clinics within 1km
LifestylePark 786m away · Swimming pool within 2km
ShoppingNo supermarket within 2km · Mall 1.9km away
Getting around
Expressway 1.9 kmPrimary road 166 m · Isolation Ring RoadRailway line 2.8 kmRailway station 2.9km away (Shri Chatrapati Shahu Maharaj Terminus)Limited bus connectivity nearby
Water & environment
Water body 443 m
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~28 m of the recorded location until 2022; a building is first visible in 2023 and is about 12 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~28 m of the filed location.
Satellite photographs of the same ground
Jan 2017Apr 2023Apr 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2023.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~28 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹38,654per sq yd
₹46,230per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 12 divisions of “Kolhapur (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹32,860 – ₹61,271 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
06
Planning authority
MahaRERA · Approved building plan
Maharashtra Housing and Area Development Authority (MHADA)
Housing Authority
Building Permit
Survey no. 259 A
The promised possession date (30 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Maharashtra Housing and Area Development Authority (MHADA)
Planning authority
Has approved 438 RERA projects — 2.2% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
341
On record
13,458 flats · 0 plots
Reach
18 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
221 residential projects still under way within 25 km. Step out ring by ring:
Of the 461 projects the radar draws within 6 km — every kind, every stage — 199 are residential projects still under way. This list keeps only those, and looks further out.
19 projects within 1 km — showing the nearest 6.
210 m awayOthers
HARIPRIYA SANKUL
DATTA SAI BUILDERS AND DEVELOPERS · Kolhapur · Karvir
2 yr 8 mo
Jul 2023registered
Mar 2026target completion
Government Guidance Rate₹38,654/sq ydScale69 flatsAuthorityMahaRERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates.
06Planning authority
MahaRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
MahaRERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/sri-sri-residency-kolhapur-m-corp-karvir-v2xr2u2k.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.