This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Units
70 units
Mix
35 × 1 BHK · 21 × 2 BHK · 14 × Shop
Carpet area
8–44 sq mper-unit range, as filed
Floors
8
Parking
64 spaces
Land area
1,438 sq m
Sanctioned built-up
3,165 sq m
Recreational open space
1,034 sq m
Timeline
RERA registeredJun 2023
Proposed completionDec 2024
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
70 units across 10 batches
TypeArea sq mCount
Shop114
Shop82
Shop124
Shop92
Shop142
1 BHK3114
1 BHK317
2 BHK4414
1 BHK3114
2 BHK447
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Old Survey no. 46/1 (New survey no. 106) Plot no. 1 to 13, AND OTHERS
North boundary
106
East boundary
106
South boundary
9m
West boundary
106
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 795m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 985 m · Karjat RoadRailway line 730 m · Mumbai-Pune RailwayRailway station 823m away (Neral Junction)Limited bus connectivity nearby
Water & environment
Water body 383 mRiver 507 m · Ulhas
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹41,054per sq yd
₹49,100per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Dhamote”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Raigad Zilla Parishad Alibag
Building Permit
Survey no. Old Survey no. 46/1 (New survey no. 106) Plot no. 1 to 13, AND OTHERS
The promised possession date (15 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Raigad Zilla Parishad Alibag
Planning authority
Has approved 15 RERA projects — 0.1% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
15
On record
70 flats · 0 plots
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
1,176 residential projects still under way within 25 km. Step out ring by ring:
Of the 337 projects the radar draws within 6 km — every kind, every stage — 73 are residential projects still under way. This list keeps only those, and looks further out.
11 projects within 1 km — showing the nearest 6.
140 m awayOthers
Sunrise Arcade
SUNRISE CONSTRUCTION · Dhamote · Karjat
4 yr 7 mo
May 2025registered
Dec 2029target completion
Government Guidance Rate₹41,054/sq ydScale33 flatsAuthorityMahaRERA