Sunshine Landmark Phase II

P52700048591 · MahaRERA · https://gethorizon.in/projects/sunshine-landmark-phase-ii-kolki-ct-phaltan-ue9m4r19

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
Sunshine Landmark Phase II
Floors
2
Buildings
3
Parking
8 spaces
Land area
592 sq m
Sanctioned built-up
527 sq m

Timeline

RERA registeredJan 2023
Proposed completionApr 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

PSK Group

PartnershipPromoter type
Satara, MAHARASHTRABased in
1Projects
1City
2023–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Kolki (CT)
Taluka
Phaltan
District
Satara
Pincode
415523
Survey no.
86/3,4,5/1/38/39/40/41
North boundary
9 M Wide Road
East boundary
Plot No 34 35 36 37 and Compound
South boundary
Compound and 4 M Wide Road
West boundary
Plot No 42 and Compound
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.1km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 373 m · Dahiwadi Phaltan RoadPrimary road 1.2 kmRailway line 4.2 kmRailway station 4.5km away (Phaltan)Limited bus connectivity nearby
Water & environment
Water body 205 mCanal 1.0 km · Right Bank Canal
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Add Collector Satara

Collector office
Building Permit
Survey no. 86/3,4,5/1/38/39/40/41

The promised possession date (1 Apr 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

75 residential projects still under way within 25 km. Step out ring by ring:

Of the 85 projects the radar draws within 6 km — every kind, every stage — 31 are residential projects still under way. This list keeps only those, and looks further out.

4 projects within 1 km — showing the nearest 4.

380 m awayResidential / Group Housing

Trimurti Heights

Chandrakant Sadhu Pakhale · Kolki · Phaltan

Apr 2025registered
Mar 2027target completion
Scale29 flatsAuthorityMahaRERA
670 m awayMixed

LAMBODAR PARK

V K G DEVELOPERS · Kolki · Phaltan

Aug 2025registered
May 2029target completion
Scale70 flatsAuthorityMahaRERA
700 m awayResidential / Group Housing

Vitthal Pride

Agastya Properties · Kolki · Phaltan

Jun 2025registered
Mar 2028target completion
Scale26 flatsAuthorityMahaRERA
860 m awayOthers

J.K.CLASSIC

J K ASSOCIATES · Kolki · Phaltan

Dec 2022registered
Dec 2027target completion
Scale30 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.