HORIZON
Share

TAJ ELITE

P52000077193 · MahaRERA · https://gethorizon.in/projects/taj-elite-panvel-us67unxq

01

Complete project overview

MahaRERA · Registration filing
Units
21 units
Floors
5
Buildings
2
Parking
24 spaces
Land area
910 sq m
Sanctioned built-up
3,481 sq m

Timeline

RERA registeredJul 2024
Proposed completionJun 2028
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Flat fit-out0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
External finishes10%
Internal finishes50%
Stairs & lifts80%
Excavation100%
Plinth100%
Stilt floor100%
Superstructure100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

KINGS DEVELOPERS

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2024–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Panvel
Taluka
Panvel
District
Raigarh
Pincode
410221
Survey no.
PLOT NO 89 SECTOR 8 AT PUSHPAK
North boundary
PLOT NO 90
East boundary
15 MTRS WIDE ROAD
South boundary
PLOT NO 88
West boundary
PLOT NO 74 75
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.2km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 623 m · JNPT RoadPrimary road 1.2 km · Dapoli Targhar RoadRailway line 1.0 kmRailway station 4.4km away (Khandeshwar)Limited bus connectivity nearby
Water & environment
River 1.4 kmWater body 1.4 km · Pargaon Talaab
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹78,680per sq yd
₹94,100per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Panvel”.
In force
2026-2027 schedule
Spread
₹35,786₹1,30,185 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

City and Industrial Development Corporation (CIDCO)

Development Authority
Building Permit
Survey no. PLOT NO 89 SECTOR 8 AT PUSHPAK
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

City and Industrial Development Corporation (CIDCO)

Metropolitan / development authority

Has approved 885 RERA projectsabout 1 in 23 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
724
On record
7,061 flats · 987 plots
Reach
5 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

2,140 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,264 projects the radar draws within 6 km — every kind, every stage — 550 are residential projects still under way. This list keeps only those, and looks further out.

83 projects within 1 km — showing the nearest 6.

50 m awayMixed

SIDDHIVINAYAK SPRINGS

RIU HOMES PRIVATE LIMITED · Dapoli · Panvel

Apr 2026registered
Mar 2030target completion
Government Guidance Rate₹46,238/sq ydScale77 flatsAuthorityMahaRERA
110 m awayOthers

SIDDHIVINAYAK SOLITAIRE

RIU HOMES PRIVATE LIMITED · Dapoli · Panvel

Jul 2025registered
Mar 2032target completion
Government Guidance Rate₹46,238/sq ydScale154 flatsAuthorityMahaRERA
130 m awayOthers

MATRIX LANDMARK

MATRIXINFRA · Dapoli · Panvel

Jan 2024registered
Dec 2028target completion
Government Guidance Rate₹46,238/sq ydScale222 flatsAuthorityMahaRERA
160 m awayResidential / Group Housing

Suyash Hills

Aarsh Enterprise · Pushapak · Panvel

Mar 2026registered
Dec 2031target completion
Scale99 flatsAuthorityMahaRERA
190 m awayMixed

VISTA HILLS

GLOBAL CONSTRUCTION · Dapoli · Panvel

Sep 2025registered
Mar 2029target completion
Government Guidance Rate₹46,238/sq ydScale113 flatsAuthorityMahaRERA
220 m awayOthers

Amrut Vishva

Anaahat Enterprise · Dapoli · Panvel

Jan 2024registered
Dec 2027target completion
Government Guidance Rate₹46,238/sq ydScale57 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.