HORIZON
Share

VARADSIDDHI PLAZA

P52100052597 · MahaRERA · https://gethorizon.in/projects/varadsiddhi-plaza-pimpri-chinchawad-m-haveli-t8h0z1yr

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
10 units
Floors
7
Buildings
2
Parking
15 spaces
Land area
298 sq m
Sanctioned built-up
476 sq m

Timeline

RERA registeredSep 2023
Proposed completionJun 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

VARADSIDDHI ASSOCIATES

PartnershipPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2023–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
District
Pune
Pincode
411017
Survey no.
68/1/20 & 68/1/21 P CTS NO. 2941 P & 2940 P AT RAHATANI
North boundary
CTS NO 2942 2943 2944
East boundary
CTS 2937
South boundary
CTS NO 2938 AND 2939
West boundary
ROAD
What’s nearby
Schools1 school within 1km · College or university 713m away
HealthcareHospital 575m away · 2 clinics within 1km · Pharmacy within 500m
LifestylePark 881m away · Gym or sports centre 1.1km away · 3 restaurants and cafes within 1km
ShoppingSupermarket 671m away · Mall 617m away · Bank 528m away
Getting around
Expressway 2.5 kmPrimary road 524 m · Hedgewar roadRailway line 2.0 km · Mumbai–Pune RailwayRailway station 2.0km away (Pimpri)Bus stop within 1km
Water & environment
River 787 m · Pavana RiverWater body 982 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹58,077per sq yd
₹69,460per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 103 divisions of “Pimpri Chinchawad (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹27,183₹1,50,076 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Pimpri Chinchwad Municipal Corporation

Municipal Corporation
Building Permit
Survey no. 68/1/20 & 68/1/21 P CTS NO. 2941 P & 2940 P AT RAHATANI

The promised possession date (30 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Pimpri Chinchwad Municipal Corporation

Municipal corporation

Has approved 1,391 RERA projectsabout 1 in 14 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
1,080
On record
9,009 flats · 249 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,285 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,878 projects the radar draws within 6 km — every kind, every stage — 610 are residential projects still under way. This list keeps only those, and looks further out.

17 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

Sapphire Nest

Mangaldeep Associates · Pimpale Saudagar · Haveli

Sep 2026registered
Dec 2029target completion
Government Guidance Rate₹73,420/sq ydScale65 flatsAuthorityMahaRERA
10 m awayOthers

PRISMA CENTRAL

PRISMA PROPERTIES · Pimpri Chinchawad · Haveli

Mar 2025registered
May 2027target completion
Government Guidance Rate₹58,077/sq ydScale16 flatsAuthorityMahaRERA
560 m awayOthers

KK Capitol

SHAH AND ASSOCIATES · Pimpri Chinchawad · Haveli

Jun 2024registered
Dec 2026target completion
Government Guidance Rate₹58,077/sq ydScale42 flatsAuthorityMahaRERA
570 m awayResidential / Group Housing

Legacy Kairos A and B Building

Legacy Lifespaces LLP · Pimpri Chinchawad · Haveli

Dec 2022registered
Mar 2027target completion
Government Guidance Rate₹58,077/sq ydScale264 flatsAuthorityMahaRERA
600 m awayResidential / Group Housing

AURELIA

SHITOLE PROPERTIES · Pimpri Chinchawad · Haveli

Jul 2024registered
Dec 2026target completion
Government Guidance Rate₹58,077/sq ydScale15 flatsAuthorityMahaRERA
650 m awayOthers

Adi Amma Insperia

J N Realty And Homes · Pimpri Chinchawad · Haveli

Aug 2023registered
Jul 2026target completion
Government Guidance Rate₹58,077/sq ydScale132 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.