1. Kindly read the Total Area of the Project and the Phase Area of the Project as same i.e. 6228.90 Sq. Mtrs. whereas the fees of RERA is previously submitted for 3889.30 Sq. Mtrs. which is Rs.38,893/- and the additional fee for the remaining area i.e. 2339.60 Sq. Mtrs. which amounts to Rs.23,396/- has been deposited in RERA Rajasthan, Jaipur Col. ("Account"), with HDFC Bank Ltd., Jaipur through online mode as on 04-04-2019, subsequently.
2. Lease Deed (Patta) and Construction Approval for Villa/Plot No.1,2,3,4,5 and 41 shall be released by the Urban Improvement Trust (UIT), Barmer after the completion of Internal Development Work of the Project, whereas the details such as conversion order u/s 90-A of the Rajasthan Land Revenue Act, 1956, layout plans, construction permission, etc. for remaining Villas/Plots are enclosed herewith.As per remark the correct phase area has been rectified in Land Details of Registering Project.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 516 mPrimary road 1.2 km · Phalsund-Barmer RoadRailway line 681 mRailway station 3.6km away (Barmer)Limited bus connectivity nearby
Price analysisdeclared build cost — not a sale price
₹7.06 Cr declared. What that works out to:
7%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~45 m of the recorded location until 2020; a building is first visible in 2021 and is about 5 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~45 m of the filed location.
Satellite photographs of the same ground
Mar 2017Apr 2023Apr 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2021.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~45 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
RAJ-RERA · Approved building plan
Urban Improvement Trust
Urban Improvement Trust
Building Permitapproved 11 Apr 2019 · 7 yrs ago
The promised possession date (31 Mar 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Urban Improvement Trust
A city-level Urban Improvement Trust — Rajasthan's town-development body in cities without a development authority. It has approved 612 RERA projects across 20 districts — about 1 in 4 in Rajasthan.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
4 residential projects still under way within 25 km. Step out ring by ring:
Of the 23 projects the radar draws within 6 km — every kind, every stage — 3 are residential projects still under way. This list keeps only those, and looks further out.
3 projects between 3 and 6 km — showing the nearest 3.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Rajasthan's published schedules.
06Planning authority
RAJ-RERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
RAJ-RERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/viratra-vihar-barmer-h3dj02pe.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.