HORIZON
Share

Amanora Gold Towers 42 and 43

P52100017612 · MahaRERA · https://gethorizon.in/projects/amanora-gold-towers-42-and-43-hadapsar-haveli-p2fz08re

01

Complete project overview

MahaRERA · Registration filing
Project name
Amanora Gold Towers 42 and 43
Units
666 units
Mix
380 × 2 BHK · 190 × 1.5 BHK · 96 × 1 BHK
Carpet area
34–60 sq mper-unit range, as filed
Floors
37
Buildings
2
Parking
666 spaces
Land area
30,254 sq m
Sanctioned built-up
49,961 sq m
Recreational open space
3,070 sq m

Timeline

RERA registeredAug 2018
Proposed completionDec 2023
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

666 units across 11 batches
TypeArea sq mCount
1 BHK3794
1.5 BHK47189
2 BHK602
2 BHK57126
2 BHK571
2 BHK5427
2 BHK583
2 BHK55221
1 BHK351
1.5 BHK511
1 BHK341

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

City Corporation Limited

CompanyPromoter type
Pune, MAHARASHTRABased in
13Projects
1City
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
5,705 homes · 88 plotson the public record across 13 projects
5,96,081 sq mbuilt-up filed
84,369 sq mplotted area
3,48,901 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from City Corporation Limited— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Hadapsar
Taluka
Haveli
District
Pune
Pincode
411028
Survey no.
Sector R29
North boundary
Survey no 43 by 1 by 1 and Survey no 43 by 1 by 2
East boundary
Regional Plan Road
South boundary
Survey no 184
West boundary
Magarpatta Sub Station
What’s nearby
SchoolsNearest school 1.4km away · Library 1.9km away
HealthcareHospital 643m away · 4 clinics within 1km
LifestylePark 792m away · Gym or sports centre 1.4km away · Swimming pool within 2km
ShoppingSupermarket 882m away · Bank 832m away
Getting around
Expressway 754 m · Mundhwa Road Railway FlyoverPrimary road 806 m · Mundhwa RoadRailway line 500 m · Pune - Daund Railway LineRailway station 1.3km away (Hadapsar Railway Station)Limited bus connectivity nearby
Water & environment
Water body 724 m · amanora lake
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹52,617per sq yd
₹62,930per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Hadapsar”.
In force
2026-2027 schedule
Spread
₹31,923₹87,952 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

2,973 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,072 projects the radar draws within 6 km — every kind, every stage — 402 are residential projects still under way. This list keeps only those, and looks further out.

39 projects within 1 km — showing the nearest 6.

460 m awayMixed

Kumar Prism Tower A

Kumar Prism Realty LLP · Keshavnagar-Mundwa · Pune City

Dec 2025registered
Dec 2031target completion
Government Guidance Rate₹79,257/sq ydScale82 flatsAuthorityMahaRERA
510 m awayOthers

Amanora Gateway Towers 2 - Towers 102 and 103

City Corporation Limited · Hadapsar · Haveli

Mar 2025registered
Jun 2029target completion
Government Guidance Rate₹52,617/sq ydScale340 flatsAuthorityMahaRERA
550 m awayResidential / Group Housing

Amanora Gateway Towers 2 – Tower 101

City Corporation Limited · Hadapsar · Haveli

Sep 2025registered
Dec 2030target completion
Government Guidance Rate₹52,617/sq ydScale170 flatsAuthorityMahaRERA
570 m awayResidential / Group Housing

Amanora Arbano Towers 73,74,75 and 76

City Corporation Limited · Hadapsar · Haveli

Jul 2023registered
May 2028target completion
Government Guidance Rate₹52,617/sq ydScale843 flatsAuthorityMahaRERA
570 m awayResidential / Group Housing

Amanora Arbano Towers 71 and 72

City Corporation Limited · Hadapsar · Haveli

Sep 2023registered
May 2028target completion
Government Guidance Rate₹52,617/sq ydScale229 flatsAuthorityMahaRERA
620 m awayResidential / Group Housing

Kumar Parc Residences - B2

Kumar Properties Infratech Developers Pvt Ltd · Hadapsar · Haveli

Mar 2023registered
Dec 2027target completion
Government Guidance Rate₹52,617/sq ydScale230 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.