Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
28 units across 1 batch
TypeArea sq mCount
3 BHK Residential Flats10028
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
GujRERA · Registration filing
Taluka
Ahmedabad City
District
Ahmedabad
Address
"ARMAN 28" NEAR RAJKAMAL BAKERY,HIRABHAI KANYA SHALA ROAD,BHAIRAVNATH,MANINAGAR
What’s nearby
Schools1 school within 1km · 5 educational institutions within 1km · College or university 563m away
HealthcareHospital 173m away · 12 clinics within 1km · Doctor's clinic within 1km
LifestylePark 614m away · Swimming pool within 2km
ShoppingNo supermarket within 2km · Bank 171m away · ATM within 500m
Getting around
Expressway 4.5 km · FlyoverPrimary road 494 mRailway line 1.3 km · Western Railway LineRailway station 1.2km away (Maninagar)2 bus stops within 500m
Water & environment
Canal 637 m · Kharicut CanalWater body 967 m · Chandola Lake
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹11.27 Cr declared to build 28 flats. What that works out to:
₹40.23 Lakhdeclared cost per flatall-in — land + construction
₹3,727/sq ftof carpet area₹40,112/sq m
17%of the cost is land₹1,857/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹11,497per sq yd
₹13,750per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for the village of “MANINAGAR- FINAL T.P.S NO - 4”.
In force
2011 schedule
This filing declares ₹40,112 per sq m of carpet area — 2.92× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
GujRERA · Approved building plan
Ahmedabad Urban Development Authority
Urban Development Authority
Building Permitapproved 12 Jul 2022 · 4 yrs ago
Building-Use (BU) permission — the occupancy sign-off, on record
All 1 block carry a Building-Use (BU) permission (latest 7 Aug 2024)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The approving body, at scale
Ahmedabad Urban Development Authority
Urban Development Authority
Has approved 2,400 RERA projects — about 1 in 7 in Gujarat.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
1,936
On record
3,12,468 flats · 1,153 plots
Reach
22 talukas
Since
2007
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,554 residential projects still under way within 25 km. Step out ring by ring:
Of the 971 projects the radar draws within 6 km — every kind, every stage — 324 are residential projects still under way. This list keeps only those, and looks further out.