Filed by floor and type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
285 units across 36 batches
BuildingFloorTypeArea sq mCount
CommercialGFSHOP452
CommercialGFSHOP392
CommercialGFSHOP402
CommercialGFSHOP3834
CommercialGFSHOP492
CommercialGFSHOP732
CommercialGFSHOP852
CommercialGFSHOP862
CommercialGFSHOP732
CommercialGFSHOP3936
CommercialGFSHOP594
CommercialGFSHOP92
Commercial1SHOP614
Commercial1SHOP3134
Commercial1SHOP422
Commercial1SHOP632
Commercial1SHOP784
Commercial1SHOP512
Commercial1SHOP652
Commercial1SHOP3240
Commercial1SHOP592
Commercial1SHOP572
Commercial1SHOP42
Commercial2SHOP962
Commercial2SHOP752
Commercial2SHOP3134
Commercial2SHOP634
Commercial2SHOP422
Commercial2SHOP784
Commercial2SHOP512
Commercial2SHOP652
Commercial2SHOP3238
Commercial2SHOP651
Commercial2SHOP592
Commercial2SHOP572
Commercial2SHOP42
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 194 m · Noida-Greater Noida ExpresswayRailway line 3.7 km · Western Dedicated Freight CorridorMetro station 441m away (Noida Sector 148)Limited bus connectivity nearby
Water & environment
Water body 951 mRiver 1.5 km · Hindon River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹117.07 Cr declared to build 285 flats. What that works out to:
₹41.08 Lakhdeclared cost per flatall-in — land + construction
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~40 m of the recorded location until 2018; a building is first visible in 2019 and is about 18 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Apr 2017Feb 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2019.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Uttar Pradesh registration department
In Uttar Pradesh it’s called the circle rate.
No government guidance rate is shown for this project.
Uttar Pradesh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
UP-RERA · Approved building plan
approved 8 Nov 2016 · 9 yrs ago
Building Permit no. M/V/N/2016/IV-1493/940
The promised possession date (26 Oct 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan M/V/N/2016/IV-1493/940 on the approving authority’s portal to confirm the approval.
Planning authority — done
07
Complaints & litigation
UP-RERA · public record
Complaints register
34 complaints on UP-RERA’s register for this project.
A count from the authority’s public register — not a judgement. A disposed complaint may have been resolved for or against the builder, and only disputes escalated this far appear at all.
Across this builder's projects in UP
UP-RERA's own register
Complaints against the builder
74
Its projects on UP RERA
3
UP RERA's own count across every project this builder has registered — not this project's alone.
What the builder declared
Declared to UP-RERA
Litigation
None declared in this filing
Only what the builder declared, or what UP-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with UP-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
129 commercial projects still under way within 25 km. Step out ring by ring:
Of the 114 projects the radar draws within 6 km — every kind, every stage — 18 are commercial projects still under way. This list keeps only those, and looks further out.
1 project between 1 and 3 km — showing the nearest 1.
2.9 km awayCommercial
KB India Mart
SHREE KUNJ BIHARIJI INFRACON PVT. LTD. · Gautam Buddha Nagar
4 yr 10 mo
Jan 2022registered
Nov 2026target completion
⚠ no escrow declaredDeclared cost₹200.00 CrScale421 flatsAuthorityUP-RERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Uttar Pradesh's published schedules.
06Planning authority
UP-RERA: the approved building plan, as filed.
07Complaints & litigation
Across this builder's projects in UP: UP-RERA's own register.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/ats-kinghood-drive-gautam-buddha-nagar-qtw89ir8.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.