Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
191 units across 23 batches
TypeArea sq mCount
2.5 BHK8217
2.5 BHK8114
2 BHK7314
2 BHK7214
4 BHK17314
4 BHK1291
2 BHK733
4 BHK1731
Studio332
1 BHK361
1 BHK381
4 BHK1283
1 BHK381
Studio371
Studio231
1 BHK371
3 BHK10624
3 BHK11125
3 BHK12548
Duplex2272
3 BHK1071
3 BHK1061
3 BHK1111
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 1.7 km · Thane Ghodbunder RoadPrimary road 195 m · Eastern Express TurnpikeRailway line 2.9 kmMetro station 956m away (Azad Nagar Bus Stop)9 bus stops within 500m
Water & environment
Water body 175 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹60,034per sq yd
₹71,800per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 101 divisions of “Thane (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,923 – ₹1,55,185 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Thane Municipal Corporation
Municipal Corporation
Building Permit
Survey no. 68/1 part, 68/3A part, 59/A/30/2/3 part
The promised possession date (31 Jan 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Thane Municipal Corporation
Municipal corporation
Has approved 489 RERA projects — 2.4% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
318
On record
7,890 flats · 0 plots
Reach
5 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC006000000197196
7 Aug 2023
Court cases, as declared
Declared by the builder
2 cases
Number
Forum
Date
26416
High Court of Bombay
2018
310
Civil Judge Senior Division Thane at Thane
2017
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
4,721 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,374 projects the radar draws within 6 km — every kind, every stage — 426 are residential projects still under way. This list keeps only those, and looks further out.
7 projects within 1 km — showing the nearest 6.
420 m awayResidential / Group Housing
25HOURLIFE - Tower A1
RUNWAL DEVELOPERS LIMITED · Thane
7 yr 1 mo
Nov 2023registered
Dec 2030target completion
⚠ 5 open complaintsGovernment Guidance Rate₹60,034/sq ydScale590 flatsAuthorityMahaRERA