8 on filequarterly progress reports filed with RERA
Timeline
RERA registeredApr 2022
Proposed completionJul 2026
TodaySep 2026
Construction progress
100% overall, as filed
Internal Roads And Footpaths100%
Sewerage100%
Storm Water Drains100%
Street Lighting100%
Energy Maanagement100%
Boundary Wall100%
Security Service100%
From the builder's latest quarterly progress report filed with RERA Chhattisgarh — % complete overall and per infrastructure work, as of that filing. A dated snapshot, not a live tracker.
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
47 plots across 35 batches
TypeArea sq mCount
Plot1,8176
Plot1,5376
Plot1,4633
Plot1,2491
Plot9301
Plot8441
Plot8811
Plot2,1211
Plot1,5441
Plot1,3791
Plot1,3521
Plot4411
Plot4481
Plot1,0501
Plot8681
Plot1,0871
Plot1,0151
Plot1,1321
Plot8301
Plot3621
Plot3931
Plot3401
Plot3661
Plot3111
Plot3261
Plot4341
Plot4391
Plot4401
Plot1,0081
Plot1,0171
Plot1,2681
Plot1,0161
Plot9051
Plot9631
Plot3,7241
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.4 kmPrimary road 351 m · Raipur BypassRailway line 325 mRailway station 2.9km away (Mandhar)Limited bus connectivity nearby
Water & environment
Water body 1.0 kmCanal 2.6 km · NaalaRiver 4.6 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹16.29 Cr declared to build 47 plots. What that works out to:
₹34.66 Lakhdeclared cost per plotall-in — land + construction
11%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~40 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Mar 2017Jan 2023Jan 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Chhattisgarh registration department
In Chhattisgarh it’s called the collector guideline rate.
No government guidance rate is shown for this project.
Chhattisgarh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Complaints & litigation
RERA Chhattisgarh · public record
Complaints, as the builder reports them
None in the builder’s latest quarterly return to RERA Chhattisgarh.
The builder’s own count of grievances it received — not RERA Chhattisgarh’s register, which isn’t published. Cases the builder declares are listed below.
What the builder declared
Declared to RERA Chhattisgarh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Chhattisgarh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Chhattisgarh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
43 commercial projects still under way within 25 km. Step out ring by ring:
Of the 145 projects the radar draws within 6 km — every kind, every stage — 3 are commercial projects still under way. This list keeps only those, and looks further out.
3 projects between 3 and 6 km — showing the nearest 3.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Chhattisgarh's published schedules.
06Complaints & litigation
RERA Chhattisgarh's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/dadu-logistic-park-raipur-bi7hai7x.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.