VENTURA IRIS
Ventura Realtors India Pvt Ltd
Fern Silver Springs
Timeline
88% overall, as filed
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
In Kerala it’s called the fair value.
No government guidance rate is shown for this project.
Kerala's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (8 Apr 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan PT-224/08 on the approving authority’s portal to confirm the approval.
A village-level local self-government (LSGI) that issues the permit — Kerala's most common approving body. It has approved 268 RERA projects across 13 districts — about 1 in 6 in Kerala.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Only what the builder declared, or what K-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
185 residential projects still under way within 25 km. Step out ring by ring:
Of the 7 projects the radar draws within 6 km — every kind, every stage — 1 is a residential project still under way. This list keeps only those, and looks further out.
1 project between 3 and 6 km — showing the nearest 1.
Ventura Realtors India Pvt Ltd
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.
What this record cannot tell you