Fern Silver Springs

T1/OL/212/2024 · K-RERA · https://gethorizon.in/projects/fern-silver-springs-keezhmad-ernakulam-qlnc81p4

01

Complete project overview

K-RERA · Registration filing
Project name
Fern Silver Springs
Units
81 units
Mix
28 × 3BHK C TYPE · 28 × 2BHK B TYPE · 24 × 3BHK A TYPE · 1 × 3BHK PENTHOUSE
Booked
36 of 81 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,680 sq m
Floor area
14,135 sq m
Description
Fern Silver Springs

Timeline

Project startedJan 2015
Proposed completionApr 2021
RERA registeredOct 2025
TodaySep 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

45 of 81 available
TypeArea sq mAvailable
3BHK C TYPE9419 of 28
3BHK PENTHOUSE1390 of 1
3BHK A TYPE997 of 24
2BHK B TYPE7519 of 28

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

Fern Valley Estates And Projects

PartnershipPromoter type
Ernakulam, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
A M Road Thottummugham
Village
KEEZHMAD
Taluk
Aluva
District
Ernakulam
Pincode
683105
Survey no.
66/15-2, 66/15-3, 66/15-4
Patta no.
119005, 119011, 15463
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.2km away
LifestyleNo parks within 2km · 5 restaurants and cafes within 1km
ShoppingNo supermarket within 2km
Getting around
Primary road 30 m · Aluva - Munnar RoadNo metro or railway within 5km7 bus stops within 500m
Water & environment
Canal 149 m · Periyar Valley Irrigation ProjectWater body 1.1 km · KULAMRiver 2.3 km
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Kerala registration department

In Kerala it’s called the fair value.

No government guidance rate is shown for this project.

Kerala's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

K-RERA · Approved building plan

Keezhmadu Grama Panchayat

Grama Panchayat
approved 11 Sep 2018 · 8 yrs ago
Building Permit no. PT-224/08Survey no. 66/15-2, 66/15-3, 66/15-4

The promised possession date (8 Apr 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan PT-224/08 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Grama Panchayat

A village-level local self-government (LSGI) that issues the permit — Kerala's most common approving body. It has approved 268 RERA projects across 13 districts about 1 in 6 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

185 residential projects still under way within 25 km. Step out ring by ring:

Of the 7 projects the radar draws within 6 km — every kind, every stage — 1 is a residential project still under way. This list keeps only those, and looks further out.

1 project between 3 and 6 km — showing the nearest 1.

THRIKKAKARA NORTHResidential (Apartment)

VENTURA IRIS

Ventura Realtors India Pvt Ltd

Jun 2024registered
Apr 2026target completion
Government Guidance Rate₹9,933/sq ydScale24 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.