This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
1,032 units across 51 batches
TypeArea sq mCount
2 BHK7328
2 BHK6928
3 BHK9926
3 BHK9228
2 BHK6428
2 BHK6715
2.5 BHK7815
3.5 BHK961
2.5 BHK7114
2 BHK6930
2 BHK6555
1 BHK512
2 BHK6614
2 BHK6528
2 BHK69118
1 BHK522
2 BHK6541
2 BHK6915
2 BHK6715
2 BHK6829
2.5 BHK8114
2 BHK671
2 BHK6715
2 BHK7015
2.5 BHK8014
1 BHK541
1 BHK4614
1 BHK5713
1 BHK5714
1 BHK4614
1 BHK3914
1 BHK3929
2 BHK6470
2 BHK6413
2 BHK6413
1 BHK4014
1 BHK4014
2 BHK6439
1 BHK4014
1 BHK4014
1 BHK4014
1 BHK4014
1 BHK4014
1 BHK4014
2 BHK6413
2 BHK6414
1 BHK4014
1 BHK4014
2 BHK6413
1 BHK3913
2 BHK6414
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400071
Survey no.
CTS Nos.53/pt and 52/pt
North boundary
CTS No 54 and 56 and 9 mtr wide road
East boundary
CTS No 57 and 58 and 12 mtr wide SN Rd no 4
South boundary
CTS No 51 and 9 mtr wide SN Road no 3
West boundary
CTS No 49 and 9 mtr wide road
What’s nearby
Schools2 schools within 500m · Library 1.6km away
HealthcareHospital 153m away · 11 clinics within 1km · Pharmacy within 1km
LifestylePark 987m away · Gym or sports centre 615m away · 26+ restaurants and cafes within 1km
Expressway 8 mPrimary road 2.1 km · Sewri-Chembur RoadRailway line 1.1 km · Central Railway (Harbour Line)Metro station 130m away (Diamond Garden)2 bus stops within 500m
Water & environment
Water body 713 m · Ganesh Talav
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
4 complaints · 3 disposed · 1 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC006000000408088
6 Nov 2023
Roznama Approvedopen
CC006000000241289
26 May 2022
Order Approveddisposed
CC006000000198485
27 Sep 2021
Order Approveddisposed
CC006000000193227
25 May 2020
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
4,321 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,546 projects the radar draws within 6 km — every kind, every stage — 475 are residential projects still under way. This list keeps only those, and looks further out.