01

Complete project overview

MahaRERA · Registration filing
Units
27 units
Floors
16
Buildings
2
Parking
1 spaces
Land area
425 sq m
Sanctioned built-up
1,700 sq m

Timeline

RERA registeredNov 2023
Proposed completionDec 2026
TodaySep 2026
Construction progress
Podiums0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Fire protection an…0%
Electrical meter r…0%
Superstructure85%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Mass construction

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2023–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Chembur
Taluka
Kurla
District
Mumbai Suburban
Pincode
400071
Survey no.
1765 10A
North boundary
Bungalow no 17 and 18
East boundary
RGS Anantiya Building
South boundary
Existing Road
West boundary
HDFC Bank
What’s nearby
Schools1 school within 500m · College or university 1.8km away · Library 1.8km away
HealthcareHospital 89m away · 5 clinics within 1km · Pharmacy within 1km
LifestylePark 847m away · Gym or sports centre 1.1km away · 21+ restaurants and cafes within 1km
ShoppingSupermarket 130m away · Mall 651m away · Bank 506m away
Getting around
Expressway 91 m · Sion Panvel HighwayPrimary road 2.6 km · Sewri-Chembur RoadRailway line 1.1 km · Central Railway (Harbour Line)Metro station 262m away (Shivaji Chowk (Chembur))2 bus stops within 500m
Water & environment
Water body 688 m · Ganesh Talav
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 1765 10A
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,338 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,457 projects the radar draws within 6 km — every kind, every stage — 435 are residential projects still under way. This list keeps only those, and looks further out.

42 projects within 1 km — showing the nearest 6.

120 m awayResidential / Group Housing

Hiranandani Maitri Park Phase 1

SHODEN DEVELOPERS PRIVATE LIMITED · Chembur · CTSO Chembur

Apr 2026registered
Mar 2031target completion
Scale694 flatsAuthorityMahaRERA
210 m awayMixed

CHHADVA HARMONY

Chhadva & Co · Borla · Kurla

Mar 2026registered
Dec 2029target completion
Government Guidance Rate₹1,49,809/sq ydScale27 flatsAuthorityMahaRERA
340 m awayResidential / Group Housing

Kranti Heights

SIDHIVINAYAK CONSTRUCTIONS · Kurla

Jun 2024registered
Sep 2026target completion
Scale21 flatsAuthorityMahaRERA
410 m awayResidential / Group Housing

One Uttam

SHREE KRISHNA LIVING LLP · Borla · Kurla

Jan 2026registered
Dec 2029target completion
Government Guidance Rate₹1,49,809/sq ydScale39 flatsAuthorityMahaRERA
470 m awayResidential / Group Housing

One Uttam

SHREE KRISHNA LIVING LLP · Borla · Kurla

Jan 2026registered
Dec 2029target completion
Government Guidance Rate₹1,49,809/sq ydScale40 flatsAuthorityMahaRERA
480 m awayResidential / Group Housing

Serenity Heights

S AND T DEVELOPERS · Chembur · Kurla

Aug 2024registered
Dec 2027target completion
Scale46 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.