HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

Guru Bhakti Phase II

P52700024656 · MahaRERA · https://gethorizon.in/projects/guru-bhakti-phase-ii-satara-12stxonf

01

Complete project overview

MahaRERA · Registration filing
Project name
Guru Bhakti Phase II
Units
10 units
Mix
10 × 2 BHK
Carpet area
64–70 sq mper-unit range, as filed
Floors
6
Parking
10 spaces
Land area
356 sq m
Sanctioned built-up
713 sq m

Timeline

RERA registeredFeb 2020
Proposed completionOct 2026
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Water conservation…0%
Superstructure6%
Excavation100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

10 units across 3 batches
TypeArea sq mCount
2 BHK701
2 BHK704
2 BHK645

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

M/s Jadhav-Korattil Constructions

PartnershipPromoter type
Satara, MAHARASHTRABased in
1Projects
1City
2020–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 32 new projects last year
  • 364 nearby projects
≈ locality centre · geocoded, verified · 17.6823, 73.9886 · © OpenStreetMap contributors
Village
Satara
Taluka
Satara
District
Satara
Pincode
415002
Survey no.
CTS No 376
North boundary
Existing Building
East boundary
Muncipal Road
South boundary
CTS No 386 A
West boundary
Existing Building Staircase and Lift area
What’s nearby
Schools1 school within 500m · College or university 398m away
HealthcareHospital 103m away · 7 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Convenience store within 500m
Getting around
Expressway 3.5 kmPrimary road 242 m · Bhavani Peth RajpathNo metro or railway within 5kmBus stop within 500m
Water & environment
Water body 406 m · Futka Talav
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

144 residential projects still under way within 25 km. Step out ring by ring:

Of the 364 projects the radar draws within 6 km — every kind, every stage — 136 are residential projects still under way. This list keeps only those, and looks further out.

22 projects within 1 km — showing the nearest 6.

SataraResidential / Group Housing

Laxmi Shridhar Complex

Phadke Builders and Developers

Dec 2025registered
Dec 2029target completion
Scale27 flatsAuthorityMahaRERA
SataraResidential / Group Housing

GURUSHREE HEIGHTS

GURUSHREE DEVELOPERS

Nov 2021registered
Dec 2026target completion
Scale13 flatsAuthorityMahaRERA
SataraResidential / Group Housing

MAYURESH RESIDENCY

RAHUL BHASKAR SHALGAR

Oct 2025registered
Dec 2029target completion
Scale20 flatsAuthorityMahaRERA
SataraResidential / Group Housing

VIGHNAHARTA RESIDENCY

Aniruddha Rajesh Deshmukh

Feb 2023registered
Jan 2027target completion
Scale32 flatsAuthorityMahaRERA
SataraResidential / Group Housing

YASHORATNA APARTMENT

YASHWANTRAO BAJIRAO CHAVAN (HUF)

Jun 2018registered
May 2026target completion
Scale25 flatsAuthorityMahaRERA
SataraResidential / Group Housing

OM EMPIRE

HERAMB HOUSING PRIVATE LIMITED

Feb 2023registered
Dec 2029target completion
AuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the locality centre, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/guru-bhakti-phase-ii-satara-12stxonf.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.