The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.5km away · 4 educational institutions within 1km · College or university 851m away
HealthcareHospital 134m away · 12 clinics within 1km · Pharmacy within 500m
Lifestyle2 parks within 500m · Gym or sports centre 861m away · 32+ restaurants and cafes within 1km
ShoppingSupermarket 347m away · Convenience store within 1km · Bank 132m away
Getting around
Expressway 667 mPrimary road 554 m · Harinivas CircleRailway line 235 mRailway station 523m away (Thane)13 bus stops within 500m
Water & environment
Water body 729 m · Hariyali Talao
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood within ~28 m of the recorded location in 2016 (about 12 m), 9 m in 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~28 m of the filed location.
Satellite photographs of the same ground
Mar 2017Feb 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2016.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~28 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (30 Jun 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
The planning authority
The body that approved this project. It has approved 4,607 RERA projects across 33 districts — about 1 in 4 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
07
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
3 complaints · 3 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC006000000078735
1 Oct 2019
Court cases, as declared
Declared by the builder
13 cases
Number
Forum
Date
93
Additional Collector
2016
SRA / ENG/959/ T/PL/LOI
Hon CEO SRA
2014
1073
High Court
2013
4372
High Court
2012
165
Additional Collector
2012
Show 8 more
Number
Forum
Date
513
Commisioner Konkan Division Mumbai
2012
908
Session Court
2012
324/MISC
Metropolitan Magistrate Mulund Court
2012
1812
Additional Collector
2011
664
Commisioner Konkan Division Mumbai
2011
C/RTS/A-10
Deputy Collector
2011
114
High Court
2011
DLN/RTS/REV 37
Revenue
2009
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
4,905 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,556 projects the radar draws within 6 km — every kind, every stage — 547 are residential projects still under way. This list keeps only those, and looks further out.
76 projects within 1 km — showing the nearest 6.
60 m awayResidential / Group Housing
BAKUL CO-OPERATIVE HOUSING SOCIETY LIMITED
ADHIRAAJ DEVELOPERS · Thane
2 yr 4 mo
Mar 2025registered
Jul 2027target completion
Government Guidance Rate₹60,034/sq ydScale32 flatsAuthorityMahaRERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Maharashtra's published schedules.
06Planning authority
MahaRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
Complaints before MahaRERA.
Appeals to the Appellate Tribunal: MahaRERA's own register.
Orders said not to be complied with: MahaRERA's own register.
Court cases, as declared by the builder, in its MahaRERA filing.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/harihareshwar-sra-kurla-0vvyootv.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.