The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Thane (M Corp.)
Taluka
Thane
District
Thane
Pincode
400602
Survey no.
TIKA NO21 CTS NO4F
North boundary
TMC Road
East boundary
Akanksha CHSL
South boundary
Shivkrupa CHSL
West boundary
Shivmurti CHSL
What’s nearby
SchoolsNearest school 1.6km away · College or university 833m away · Library 390m away
HealthcareHospital 62m away · 13 clinics within 1km · Pharmacy within 1km
Lifestyle1 park within 500m · Gym or sports centre 512m away · 30+ restaurants and cafes within 1km
ShoppingSupermarket 296m away · Mall 1.7km away · Convenience store within 1km
Getting around
Expressway 364 mPrimary road 217 m · Lal Bahadur Shastri MargRailway line 559 mMetro station 631m away (Teen Hath Naka Station)23 bus stops within 500m
Water & environment
Water body 832 m · Kacharali Lake
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹60,034per sq yd
₹71,800per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 101 divisions of “Thane (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,923 – ₹1,55,185 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
The Municipal Corporation, Thane
Municipal Corporation
Building Permit
Survey no. TIKA NO21 CTS NO4F
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation
A city municipal corporation that approves projects within its own limits. It has approved 12,653 RERA projects across 34 districts — about 1 in 2 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
4,875 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,549 projects the radar draws within 6 km — every kind, every stage — 542 are residential projects still under way. This list keeps only those, and looks further out.
80 projects within 1 km — showing the nearest 6.
20 m awayResidential / Group Housing
Veer Vishwa
VEER LIFE SPACES LLP · Thane
3 yr 2 mo
Dec 2023registered
Feb 2027target completion
Government Guidance Rate₹60,034/sq ydAuthorityMahaRERA