Complete project overview

GujRERA · Registration filing
Units
76 units
Mix
76 × Commercial
Carpet area
20–21 sq mper-unit range, as filed
Parking
92 spaces
Land area
1,708 sq m

Timeline

Project startedSep 2022
RERA registeredNov 2023
Proposed completionDec 2027
TodayJul 2026
Construction progress

94% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your unit

Filed by type and size, in the batches the promoter registered — not a per-unit listing. Look yours up.

76 units across 1 batch
TypeArea sq mCount
Commercial2176

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Promoter registration

ISHAN ICON

PARTNERSHIP FIRMPromoter type
Junagadh, GujaratBased in
1Projects
1City
2023–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Junagadh
District
Junagadh
Address
MO. LA. PATEL ROAD (CHOBARI ROAD),BESIDE VINAYAK HEIGHTS,
What’s nearby
Schools3 schools within 1km · 4 educational institutions within 1km · College or university 470m away
HealthcareHospital 817m away · 2 clinics within 1km
LifestylePark 1.0km away · Gym or sports centre 1.5km away
ShoppingSupermarket 690m away · Bank 635m away
Getting around
Expressway 862 mPrimary road 707 mRailway line 997 m · Rajkot–SomnathRailway station 2.4km away (Junagadh Junction)Limited bus connectivity nearby
Water & environment
River 726 mWater body 1.8 km · Narsi Mehta Lake
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹3.76 Cr declared to build 76 flats. What that works out to:

₹3.43 Lakh – ₹8.75 Lakhdeclared unit pricerange on the filing — not a live asking price
₹4.94 Lakhdeclared cost per flatall-in — land + construction
₹2,169/sq ftof carpet area₹23,342/sq m
20%of the cost is land₹418/sq ft of land

This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Planning authority

GujRERA · Approved building plan

Others

Building Permitapproved 6 Nov 2023 · 2 yrs ago
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

The approving authority

The body that sanctioned this project. It has approved 2,653 RERA projects across 26 talukas about 1 in 6 in Gujarat.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — GujRERA does not publish a complaints register. This read cannot speak to them either way.