DWARAKA ENCLAVE
PUPPALLA CHANDRA MOULESWARA RAO · Vepagunta · Pendurthi
KANNEPALLI CASTLES
Timeline
Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.
| Unit | Type | Carpet | Balcony | Outer wall | Common | Total | Parking | Unit | Type | Carpet | Balcony | Outer wall | Common | Total | Parking |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1011st Floor · KANNEPALLI CASTLES | 2BHK | 80.21 | — | 4.62 | 25.26 | 110.09 | 7.43 | 1021st Floor · KANNEPALLI CASTLES | 2BHK | 76.14 | 3.49 | 7.51 | 22.95 | 110.09 | 7.43 |
| 1031st Floor · KANNEPALLI CASTLES | 2BHK | 85.16 | — | 6.25 | 22.86 | 114.27 | 7.43 | 1041st Floor · KANNEPALLI CASTLES | 3BHK | 94.92 | — | 8.50 | 30.36 | 133.78 | 7.43 |
| 2012nd Floor · KANNEPALLI CASTLES | 2BHK | 80.21 | — | 4.62 | 25.26 | 110.09 | 7.43 | 2022nd Floor · KANNEPALLI CASTLES | 2BHK | 76.14 | 3.49 | 7.51 | 22.95 | 110.09 | 7.43 |
| 2032nd Floor · KANNEPALLI CASTLES | 2BHK | 85.16 | — | 6.25 | 22.86 | 114.27 | 7.43 | 2042nd Floor · KANNEPALLI CASTLES | 3BHK | 94.92 | — | 8.50 | 30.36 | 133.78 | 7.43 |
| 3013rd Floor · KANNEPALLI CASTLES | 2BHK | 80.21 | — | 4.62 | 25.26 | 110.09 | 7.43 | 3023rd Floor · KANNEPALLI CASTLES | 2BHK | 76.14 | 3.49 | 7.51 | 22.95 | 110.09 | 7.43 |
| 3033rd Floor · KANNEPALLI CASTLES | 2BHK | 85.16 | — | 6.25 | 22.86 | 114.27 | 7.43 | 3043rd Floor · KANNEPALLI CASTLES | 3BHK | 94.92 | — | 8.50 | 30.36 | 133.78 | 7.43 |
| 4014th Floor · KANNEPALLI CASTLES | 2BHK | 80.21 | — | 4.62 | 25.26 | 110.09 | 7.43 | 4024th Floor · KANNEPALLI CASTLES | 2BHK | 76.14 | 3.49 | 7.51 | 22.95 | 110.09 | 7.43 |
| 4034th Floor · KANNEPALLI CASTLES | 2BHK | 85.16 | — | 6.25 | 22.86 | 114.27 | 7.43 | 4044th Floor · KANNEPALLI CASTLES | 3BHK | 94.92 | — | 8.50 | 30.36 | 133.78 | 7.43 |
| 5015th Floor · KANNEPALLI CASTLES | 2BHK | 80.61 | — | 4.22 | 25.26 | 110.09 | 7.43 | 5025th Floor · KANNEPALLI CASTLES | 2BHK | 76.14 | 3.49 | 7.51 | 22.95 | 110.09 | 7.43 |
| 5035th Floor · KANNEPALLI CASTLES | 2BHK | 85.16 | — | 4.22 | 24.89 | 114.27 | 7.43 | 5045th Floor · KANNEPALLI CASTLES | 3BHK | 94.92 | — | 8.50 | 30.36 | 133.78 | 7.43 |
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from SRI VENKATESWARA CONSTRUCTIONS AND DEVELOPERS— the full portfolio →






₹7.03 Cr declared to build 20 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
The yearly satellite view ends in 2023 and this project started in 2025, so it does not cover this project's construction: the site was still open ground within ~20 m of the recorded location when the series ends. The 2026 image shows the site more recently.
Satellite view, year by year
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.
Satellite photographs of the same ground
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.
No government guidance rate is shown for this project.
Andhra Pradesh's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 1086/1895/B/Z8/SNY/2025 on the approving authority’s portal to confirm the approval.
Has approved 1,344 RERA projects — about 1 in 5 in Andhra Pradesh, more than any other body in the state.
an apartments market — 87% apartments · 13% plotted layouts. Apartments like yours are this body's core business.
More apartment-heavy than Andhra Pradesh overall — 87% apartments here vs 74% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Andhra Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Only what the builder declared, or what RERA Andhra Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Andhra Pradesh, or that this register doesn’t publish it — never that nothing happened.
486 residential projects still under way within 25 km. Step out ring by ring:
Of the 345 projects the radar draws within 6 km — every kind, every stage — 126 are residential projects still under way. This list keeps only those, and looks further out.
16 projects within 1 km — showing the nearest 6.
PUPPALLA CHANDRA MOULESWARA RAO · Vepagunta · Pendurthi
VASUDEVA LANDMARK PROJECTS · Visakhapatnam
M/S. SAHITHYA INFRAS · Vepagunta · Pendurthi
VAISHNO CONSTRUCTIONS · Vepagunta · Pendurthi
YASHNA DEVELOPERS REP BY PROPRIETOR SMT. MAJJI MANJULA · Vepagunta · Pendurthi
AKSHAYA CONSTRUCTIONS · Vepagunta · Pendurthi
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you
Where each section of this report comes from.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/kannepalli-castles-vepagunta-pendurthi-nmzhbndd.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.