LABH SAMARTH HEIGHT

P51800011676 · MahaRERA · https://gethorizon.in/projects/labh-samarth-height-andheri-cksw4nup

01

Complete project overview

MahaRERA · Registration filing
Units
45 units
Mix
45 × Rehab
Carpet area
941 sq mper-unit range, as filed
Floors
13
Buildings
2
Parking
6 spaces
Land area
838 sq m
Sanctioned built-up
2,096 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2018
TodaySep 2026

Find your unit

Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.

45 units across 1 batch
TypeArea sq mCount
Rehab94145

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

M.V. LABH ASSOCIATES

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2017–2018Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400053
Survey no.
825/1/111D PT/29
North boundary
ROAD
East boundary
30
South boundary
METRO YARD
West boundary
28
What’s nearby
Schools2 schools within 1km · 3 educational institutions within 1km · Library 812m away
HealthcareHospital 161m away · 13 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 462m away · 77+ restaurants and cafes within 1km
ShoppingSupermarket 605m away · Mall 381m away · Convenience store within 500m
Getting around
Expressway 2.7 kmPrimary road 266 m · Link RoadRailway line 2.1 km · Western Railway (Slow)Metro station 440m away (Andheri (West))22 bus stops within 500m
Water & environment
Water body 224 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,589 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,908 projects the radar draws within 6 km — every kind, every stage — 666 are residential projects still under way. This list keeps only those, and looks further out.

44 projects within 1 km — showing the nearest 6.

90 m awayResidential / Group Housing

Roswalt Shatataraka (Unit A) CHSL

Roswalt Realty Private Limited · Ambivali · Andheri

Oct 2025registered
Sep 2028target completion
Scale49 flatsAuthorityMahaRERA
140 m awayResidential / Group Housing

MAYFAIR ARANYA

MAYFAIR HOUSING · Ambivali · Andheri

Aug 2026registered
Jul 2032target completion
Scale174 flatsAuthorityMahaRERA
190 m awayResidential / Group Housing

Skyline

Aimbitious Homes LLP · Ambivali · Andheri

Apr 2026registered
Dec 2030target completion
Scale19 flatsAuthorityMahaRERA
290 m awayResidential / Group Housing

LINKBAY RESIDENCES PHASE I

PORTSMOUTH BUILDCON PRIVATE LIMITED · Ambivali · Andheri

Nov 2022registered
Oct 2028target completion
Scale589 flatsAuthorityMahaRERA
310 m awayResidential / Group Housing

LINKBAY RESIDENCES PHASE II WING B

Portsmouth Buildcon Private Limited and Shiv Infra Vision Private Limited · Ambivali · Andheri

Oct 2025registered
Jun 2030target completion
Scale88 flatsAuthorityMahaRERA
330 m awayMixed

Polaris

POONAM DEVELOPERS LLP · Ambivali · Andheri

May 2026registered
Jun 2031target completion
Scale18 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.