HORIZON
Share

SWIZ HEIGHTS

P51800005779 · MahaRERA · https://gethorizon.in/projects/swiz-heights-andheri-me4ohjgb

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
SWIZ HEIGHTS
Units
60 units
Mix
60 × 1 BHK
Carpet area
41–44 sq mper-unit range, as filed
Floors
20
Land area
646 sq m
Sanctioned built-up
2,795 sq m
Recreational open space
175 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2019
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

60 units across 5 batches
TypeArea sq mCount
1 BHK4112
1 BHK4112
1 BHK4412
1 BHK4312
1 BHK4212

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Mohid Construction Co

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
4Projects
1City
2017–2024Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
440 homeson the public record across 4 projects
20,989 sq mbuilt-up filed
13,434 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Mohid Construction Co— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400053
Survey no.
825 PART
North boundary
CTS 825 PART
East boundary
CTS 825C 825D
South boundary
D P ROAD 18-3
West boundary
27-45 METER ROAD JUNCTION
What’s nearby
Schools1 school within 1km · Library 593m away
HealthcareHospital 237m away · 12 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 349m away · 87+ restaurants and cafes within 1km
ShoppingSupermarket 808m away · Mall 585m away · Convenience store within 500m
Getting around
Expressway 2.8 kmPrimary road 357 m · Link RoadRailway line 2.1 km · Western Railway (Fast)Metro station 645m away (Andheri (West))13 bus stops within 500m
Water & environment
Water body 385 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 825 PART

The promised possession date (31 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,589 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,929 projects the radar draws within 6 km — every kind, every stage — 673 are residential projects still under way. This list keeps only those, and looks further out.

43 projects within 1 km — showing the nearest 6.

90 m awayResidential / Group Housing

MAYFAIR ARANYA

MAYFAIR HOUSING · Ambivali · Andheri

Aug 2026registered
Jul 2032target completion
Scale174 flatsAuthorityMahaRERA
180 m awayResidential / Group Housing

Roswalt Shatataraka (Unit A) CHSL

Roswalt Realty Private Limited · Ambivali · Andheri

Oct 2025registered
Sep 2028target completion
Scale49 flatsAuthorityMahaRERA
220 m awayResidential / Group Housing

Skyline

Aimbitious Homes LLP · Ambivali · Andheri

Apr 2026registered
Dec 2030target completion
Scale19 flatsAuthorityMahaRERA
250 m awayResidential / Group Housing

ROSWALT ZAIDEN

A S HIGHTECH LLP · Andheri

Nov 2022registered
Dec 2028target completion
12 open complaintsScale1,519 flatsAuthorityMahaRERA
300 m awayResidential / Group Housing

LINKBAY RESIDENCES PHASE I

PORTSMOUTH BUILDCON PRIVATE LIMITED · Ambivali · Andheri

Nov 2022registered
Oct 2028target completion
Scale589 flatsAuthorityMahaRERA
300 m awayResidential / Group Housing

LINKBAY RESIDENCES PHASE II WING B

Portsmouth Buildcon Private Limited and Shiv Infra Vision Private Limited · Ambivali · Andheri

Oct 2025registered
Jun 2030target completion
Scale88 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.