This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
LOTUS
Units
21 units
Mix
18 × 1 RK · 3 × 1 BHK
Carpet area
18–31 sq mper-unit range, as filed
Floors
5
Parking
1 spaces
Land area
582 sq m
Sanctioned built-up
568 sq m
Timeline
RERA registeredAug 2017
Proposed completionNov 2020
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
21 units across 4 batches
TypeArea sq mCount
1 BHK313
1 RK183
1 RK219
1 RK196
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Zirad
Taluka
Alibag
District
Raigarh
Pincode
402201
Survey no.
GAT NO 622
North boundary
ZIRAD GAVTHAN
East boundary
GAT NO 621
South boundary
GAT NO 623
West boundary
ZIRAD GAOTHAN
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 4.6km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 1.3 kmRailway line 3.2 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 427 mRiver 3.4 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹41,472per sq yd
₹49,600per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Zirad”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
271 residential projects still under way within 25 km. The nearest 6:
Of the 32 projects the radar draws within 6 km — every kind, every stage — 12 are residential projects still under way. This list keeps only those, and looks further out.
3.3 km awayOthers
OCASO VADDO
Sagaj Realtors LLP · Bamansure · Alibag
3 yr 10 mo
May 2025registered
Mar 2029target completion
Government Guidance Rate₹41,472/sq ydScale15 flatsAuthorityMahaRERA