HORIZON
Share

LOTUS

P52000009085 · MahaRERA · https://gethorizon.in/projects/lotus-zirad-alibag-2ahhwtlo

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
LOTUS
Units
21 units
Mix
18 × 1 RK · 3 × 1 BHK
Carpet area
18–31 sq mper-unit range, as filed
Floors
5
Parking
1 spaces
Land area
582 sq m
Sanctioned built-up
568 sq m

Timeline

RERA registeredAug 2017
Proposed completionNov 2020
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

21 units across 4 batches
TypeArea sq mCount
1 BHK313
1 RK183
1 RK219
1 RK196

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

SWASTI INFRA

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2017–2020Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Zirad
Taluka
Alibag
District
Raigarh
Pincode
402201
Survey no.
GAT NO 622
North boundary
ZIRAD GAVTHAN
East boundary
GAT NO 621
South boundary
GAT NO 623
West boundary
ZIRAD GAOTHAN
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 4.6km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 1.3 kmRailway line 3.2 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 427 mRiver 3.4 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹41,472per sq yd
₹49,600per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Zirad”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

271 residential projects still under way within 25 km. The nearest 6:

Of the 32 projects the radar draws within 6 km — every kind, every stage — 12 are residential projects still under way. This list keeps only those, and looks further out.

3.3 km awayOthers

OCASO VADDO

Sagaj Realtors LLP · Bamansure · Alibag

May 2025registered
Mar 2029target completion
Government Guidance Rate₹41,472/sq ydScale15 flatsAuthorityMahaRERA
3.8 km awayResidential / Group Housing

Inner Circle Phase III

EXPRESS INTERIORS & CONTRACTORS LLP · Saral · Alibag

May 2024registered
Dec 2027target completion
Government Guidance Rate₹31,188/sq ydScale27 flatsAuthorityMahaRERA
3.9 km awayOthers

Casa Venero

EMAAR INDIA LIMITED · Mushet · Alibag

Oct 2024registered
Dec 2030target completion
Government Guidance Rate₹41,472/sq ydScale84 flatsAuthorityMahaRERA
4.1 km awayResidential / Group Housing

Coco Marina

Atharva Realty Private Limited · Kihim · Alibag

Dec 2025registered
Dec 2031target completion
Government Guidance Rate₹41,472/sq ydScale216 flatsAuthorityMahaRERA
4.1 km awayResidential / Group Housing

Alibaug Project

Lodha Developers Limited · Dhokawade · Alibag

Nov 2024registered
Mar 2030target completion
Government Guidance Rate₹41,472/sq ydScale11 flatsAuthorityMahaRERA
4.1 km awayOthers

AUTOGRAPH VILLAS

SUNDIAL CONSTRUCTIONS LLP · Dhokawade · Alibag

Jun 2022registered
Jan 2028target completion
Government Guidance Rate₹41,472/sq ydScale16 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.