The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Converted Sy No 20/2 and 20/7 situated at Kodiramasandra Village , Kasaba Hobli , Kolar , Kolar, Karnataka - 563103
What’s nearby
SchoolsNo schools within 2km · College or university 1.1km away
HealthcareNearest hospital 2.1km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 209 m · Kolar BypassPrimary road 209 mRailway line 2.1 kmRailway station 2.3km away (Kolar)Limited bus connectivity nearby
Water & environment
Water body 1.1 km · Honnenahalli Kere
distances only — not a flood assessment
Land, title & encumbrance
LandOwned by the promoter
ConversionConverted to non-agricultural
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹75.00 Lakh declared to build 12 plots. What that works out to:
₹6.25 Lakhdeclared cost per plotall-in — land + construction
27%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
The yearly satellite view ends in 2023 and this project started in 2024, so it does not cover this project's construction: the site was still open ground within ~40 m of the recorded location when the series ends. The 2026 image shows the site more recently.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Feb 2017Apr 2023Apr 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
This series ends in 2023, before this project’s construction — so it shows what stood here before, and says nothing about whether building has since begun. The photograph does that.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
The yearly site view ends in 2023, before this project started in 2024.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Karnataka registration department
In Karnataka it’s called the guidance value.
No government guidance rate is shown for this project.
Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
RERA Karnataka · Approved building plan
Kolar Urban Development Authority
Urban Development Authority
approved 1 Jan 2024 · 2 yrs ago
Layout Permit no. 18/ 23-24Survey no. 20/7
The promised possession date (31 May 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 18/ 23-24 on the approving authority’s portal to confirm the approval.
The approving body, at scale
Kolar Urban Development Authority
Urban Development Authority
Has approved 57 RERA projects — 0.7% of Karnataka.
a plotted-layout market — 4% apartments · 96% plotted layouts. Your plotted layout is this body's core business.
Builders
47
On record
0 flats · 5,297 plots
Reach
6 taluks
Since
2017
More layout-heavy than Karnataka overall — 96% plots here vs 38% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with RERA Karnataka against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to RERA Karnataka
Litigation
Declared free of litigation
The builder's own declaration at registration — not a court's or RERA Karnataka's finding. A flagged line is worth checking with RERA Karnataka.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Karnataka, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
38 plotted projects still under way within 25 km. Step out ring by ring:
Of the 21 projects the radar draws within 6 km — every kind, every stage — 10 are plotted projects still under way. This list keeps only those, and looks further out.
7 projects between 1 and 3 km — showing the nearest 6.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Karnataka's published schedules.
06Planning authority
RERA Karnataka: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
RERA Karnataka's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/m-r-enclave-kolar-k9hj46uh.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.