Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
53 units across 12 batches
TypeArea sq mCount
3 BHK741
2 BHK613
2 BHK656
2 BHK597
2 BHK536
2 BHK543
2 BHK628
2 BHK633
2 BHK648
2 BHK633
2 BHK541
2 BHK614
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
4,600 homeson the public record across 37 projects
3,01,155 sq mbuilt-up filed
4,61,685 sq mland declared
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Municipal Corporation of Greater MumbaiMunicipal Corporationthis project33 of 37 projects
City and Industrial Development Corporation (CIDCO)Development Authority3 of 37 projects
Navi Mumbai Airport Influence Notified Area (Naina)1 of 37 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 129 m · JNPT Road FlyoverPrimary road 2.6 kmRailway line 1.0 km · JNPTRailway station 2.6km away (Somatne)Bus stop within 1km
Water & environment
River 258 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹43,980per sq yd
₹52,600per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Kolkhe”.
In force
2026-2027 schedule
Spread
₹39,131 – ₹69,649 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Municipal Corporation of Greater Mumbai
Municipal Corporation
Building Permit
Survey no. 95/1 PT,95/2 PT 95/3PT,95/4PT,98/6 PT
The promised possession date (31 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation of Greater Mumbai
Municipal corporation
Has approved 2,862 RERA projects — about 1 in 7 in Maharashtra, more than any other body in the state.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC006000000056870
23 Sep 2019
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
1,744 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,673 projects the radar draws within 6 km — every kind, every stage — 459 are residential projects still under way. This list keeps only those, and looks further out.