HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

PALACE ORCHARD V PHASE-2

P-BPL-17-168 · RERA Madhya Pradesh · https://gethorizon.in/projects/palace-orchard-v-phase-2-bhopal-huzur-nlw6ws4e

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
PALACE ORCHARD V PHASE-2
Plots
93 plots
Unit mix
93 × Plot
Revised completion
30 Sep 2021extended after an approved RERA extension
Extensions
2 approvedcompletion-date extension(s) granted by RERA
Quarterly reports
13 on file · latest Oct 2017 - Dec 2017quarterly progress certificates filed with RERA

Timeline

Project startedOct 2017
RERA registeredMar 2020
Proposed completionMar 2020
TodaySep 2026

Find your plot

Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.

93 plots across 1 batch
TypeArea sq mCount
Plot93

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

SWADESH DEVELOPERS AND BUILDERS

Partnership Firm / LLPPromoter type
1Projects
1City
2020–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 34 new projects last year
  • 297 nearby projects
exact address · geocoded from the filed address · 23.1859, 77.4140 · © OpenStreetMap contributors
District
Bhopal
Tehsil
Huzur
Planning area
Bhopal
Address
PALACE ORCHARD V, KOLAR ROAD, BHOPAL (M.P) 462016
What’s nearby
Schools1 school within 500m · 4 educational institutions within 1km · College or university 727m away
HealthcareHospital 406m away
LifestylePark 1.2km away · Gym or sports centre 2.0km away
ShoppingSupermarket 419m away · Mall 418m away
Getting around
Primary road 3.7 kmRailway line 3.5 kmMetro station 4.5km away (DRM Office)Limited bus connectivity nearby
Water & environment
River 507 m · AjmarWater body 1.2 kmCanal 1.3 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹5.88 Cr declared to build 93 plots. What that works out to:

₹6.32 Lakhdeclared cost per plotall-in — land + construction
21%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹26,087per sq yd
₹31,200per sq m
Which rate
open plot, residential
Matched to
The rate published for “PALACE ORCHARD”, 70 m from this project.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

KOLAR MAIN ROAD PAR (WARD 80)₹80,000 / sq m₹66,890 / sq yd600 m
MANSAROVAR CAMPUS₹35,200 / sq m₹29,432 / sq yd650 m
SARVDHARM / DANISH HILLS / GRAM DAMKHEDA EVAM ANY COLONY₹30,000 / sq m₹25,084 / sq yd650 m
MANDAKINI / SARVADHARAM / SAGAR PREMIUM TOWER / GRAM DAMKHEDA KI ANYA COLONY₹30,000 / sq m₹25,084 / sq yd680 m
KOLAR MAIN ROAD PAR (WARD 82)₹80,000 / sq m₹66,890 / sq yd700 m

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Bhopal

Town & Country Planning (DTCP)
Layout Permit

The promised possession date (31 Mar 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Bhopal

Town & Country Planning area · Bhopal district

Has approved 726 RERA projectsabout 1 in 7 in Madhya Pradesh.

a mixed market63% apartments · 37% plotted layouts.

Builders
444
On record
45,421 flats · 32,913.65 plots
Reach
2 tehsils
Since
2017

More apartment-heavy than Madhya Pradesh overall — 63% apartments here vs 28% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

92 plotted projects still under way within 25 km. Step out ring by ring:

Of the 297 projects the radar draws within 6 km — every kind, every stage — 43 are plotted projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

560 m awayPlotted Development

DEVELOPMENT OF 13.73 HECTARE LAND IN PHASE 02 AT SAPPHIRE PARK CITY KATARA HILLS BHOPAL.

M.P.HOUSING & INFRASTRUCTURE DEVELOPMENTBOARD BHOPAL · Bhopal · Kolar

Jan 2025registered
Jun 2027target completion
Declared cost₹78.66 CrScale47 plotsAuthorityRERA Madhya Pradesh
560 m awayPlotted Development

SINGAPORE GRAND

AMBAJI BUILDCON · Bhopal · Kolar

Feb 2025registered
Jul 2027target completion
Declared cost₹16.96 CrScale24 plotsAuthorityRERA Madhya Pradesh
560 m awayPlotted Development

KASTURI K11

THAKUR PRASAD · Bhopal · Kolar

Sep 2025registered
Jun 2030target completion
Declared cost₹1.11 CrScale15 plotsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with RERA Madhya Pradesh, as the builder submitted it.
  2. 02Builder's track record
    • RERA Madhya Pradesh: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location & price analysis
    • Address, pincode and declared cost: the RERA Madhya Pradesh filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the exact address.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • MP Department of Registration & Stamps.
  5. 05Planning authority
    • RERA Madhya Pradesh: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • RERA Madhya Pradesh's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/palace-orchard-v-phase-2-bhopal-huzur-nlw6ws4e.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.