1). As per Township Policy 2010, 05 Plots (Plot No. 05, 07, 08, 32, 33) having Total area of 575.97 Sq. Mtrs equal to 12.5% of saleable area have been kept as mortgage under ADA Ajmer. These plots would be allotted after the internal development work of project is completed and development charges are deposited with ADA Ajmer. 2). Since it is a plotted development project therefore no parking details are required. 3. The Total Open Area 2750.79 Square meters and the area related with Green Area (Park) 274.70 Sq Mtr, Road 2406.72 Sq Mtr and apart from that area of S.W.M/Tower is 69.37 Sq Mtr.
Timeline
Construction startDec 2024
RERA registeredJan 2025
Proposed completionJun 2026
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
38 plots across 25 batches
TypeArea sq mCount
Plot951
Plot1059
Plot1341
Plot1321
Plot285
Plot1311
Plot1481
Plot941
Plot1301
Plot1291
Plot991
Plot1331
Plot1001
Plot1082
Plot1341
Plot1031
Plot1161
Plot1271
Plot1281
Plot1441
Plot1361
Plot1311
Plot1281
Plot931
Plot1351
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 459 mPrimary road 1.7 kmRailway line 990 mRailway station 2.6km away (Makarwadi)Limited bus connectivity nearby
Water & environment
Water body 965 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹1.50 Cr declared to build 38 plots. What that works out to:
₹3.95 Lakhdeclared cost per plotall-in — land + construction
₹172/sq ftof plotted area₹1,852/sq m
77%of the cost is land₹132/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates (rural branch)
In Rajasthan it’s called the DLC rate.
₹7,525per sq yd
₹9,000per sq m
Which rate
residential land
Matched to
The rate published for the village of “Kayad”.
Spread
₹3,177 – ₹7,525 per sq yd across the places it was taken over
This filing declares ₹1,852 per sq m of plotted area — 0.21× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Ajmer Development Authority
Development Authority
Layout Permitapproved 31 Jan 2025 · 1 yr ago
The promised possession date (27 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Ajmer Development Authority
Development authority
Has approved 51 RERA projects — 2.3% of Rajasthan.
a plotted-layout market — 16% apartments · 84% plotted layouts. Your plotted layout is this body's core business.
Builders
40
On record
990 flats · 3,829 plots
Reach
4 districts
Since
2017
More layout-heavy than Rajasthan overall — 84% plots here vs 66% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
35 plotted projects still under way within 25 km. Step out ring by ring:
Of the 69 projects the radar draws within 6 km — every kind, every stage — 24 are plotted projects still under way. This list keeps only those, and looks further out.
6 projects between 1 and 3 km — showing the nearest 6.