Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
38 plots across 21 batches
TypeArea sq mCount
Plot3441
Plot1171
Plot861
Plot891
Plot932
Plot981
Plot981
Plot1001
Plot1041
Plot1091
Plot1151
Plot1201
Plot1221
Plot1221
Plot1191
Plot811
Plot1441
Plot9317
Plot1021
Plot1881
Plot1,8431
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 457 mPrimary road 1.5 kmRailway line 504 mRailway station 1.3km away (Makarwadi)Limited bus connectivity nearby
Water & environment
Water body 2.8 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹1.81 Cr declared to build 38 plots. What that works out to:
₹4.76 Lakhdeclared cost per plotall-in — land + construction
₹196/sq ftof plotted area₹2,105/sq m
45%of the cost is land₹88/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
The yearly satellite view ends in 2023 and this project started in 2025, so it does not cover this project's construction: the site was still open ground within ~52 m of the recorded location when the series ends. The 2026 image shows the site more recently.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~52 m of the filed location.
Satellite photographs of the same ground
Mar 2017Feb 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
This series ends in 2023, before this project’s construction — so it shows what stood here before, and says nothing about whether building has since begun. The photograph does that.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~52 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
The yearly site view ends in 2023, before this project started in 2025.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
RAJ-RERA · Approved building plan
Ajmer Development Authority
Development Authority
Layout Permitapproved 4 Apr 2025 · 1 yr ago
The promised possession date (2 Jul 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Ajmer Development Authority
Development authority
Has approved 51 RERA projects — 2.3% of Rajasthan.
a plotted-layout market — 16% apartments · 84% plotted layouts. Your plotted layout is this body's core business.
Builders
40
On record
990 flats · 3,829 plots
Reach
4 districts
Since
2017
More layout-heavy than Rajasthan overall — 84% plots here vs 66% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
35 plotted projects still under way within 25 km. Step out ring by ring:
Of the 60 projects the radar draws within 6 km — every kind, every stage — 19 are plotted projects still under way. This list keeps only those, and looks further out.
5 projects between 1 and 3 km — showing the nearest 5.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Rajasthan's published schedules.
06Planning authority
RAJ-RERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
RAJ-RERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/seven-avenue-ajmer-rqs67iah.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.