K-RERA · Registration filing
Units
28 units
Mix
20 × 2BHK · 8 × 3BHK
Booked
25 of 28 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,457 sq m
Floor area
3,580 sq m
Description
PINNACLE ALTURA

Timeline

Project startedOct 2022
RERA registeredDec 2022
Proposed completionSep 2026
TodayJul 2026
Construction progress

13% overall, as filed

Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Staircases, Lifts Wells0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Slabs of Super Structure25%
Overhead and Underground Water Tanks.50%
Excavation100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

3 of 28 available
TypeArea sq mAvailable
3BHK851 of 4
2BHK620 of 8
2BHK631 of 12
3BHK921 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

PINNACLE PROJECTS

PartnershipPromoter type
Kozhikode, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
KOTOOLI
Village
KOTTOOLI
Taluk
Kozhikode
District
Kozhikode
Pincode
673001
Survey no.
83/5,83/90
Patta no.
10084
What’s nearby
Schools7 schools within 500m · 25 educational institutions within 1km · College or university 530m away
HealthcareHospital 197m away · Clinic within 2km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 1.6km away · 69+ restaurants and cafes within 1km
ShoppingSupermarket 373m away · Mall 729m away · Bank 327m away
Getting around
Expressway 4.1 km · Kannur-Calicut-Valanchery HighwayPrimary road 480 m · Palayam RoadRailway line 55 mRailway station 186m away (Kozhikode)4 bus stops within 500m
Water & environment
Water body 174 m · Chemmangad PondRiver 1.0 km · Kallai River
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Kozhikode Municipal Corporation

Municipal Corporation
approved 24 Sep 2022 · 3 yrs ago
Building Permit no. TP3/61977/22Survey no. 83/5,83/90
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan TP3/61977/22 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Kozhikode Municipal Corporation

Municipal corporation / municipality

Has approved 57 RERA projects3.7% of Kerala.

an apartments market96% apartments · 4% plotted layouts. Apartments like yours are this body's core business.

Builders
36
On record
3,822 flats · 80 plots
Since
2021

More apartment-heavy than Kerala overall — 96% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.