HORIZON
Share

Radiance Residency

PR/GJ/AHMEDABAD/AHMADABAD CITY/AUDA/MAA00310/031017 · GujRERA · https://gethorizon.in/projects/radiance-residency-ahmedabad-city-boxblcs1

01

Complete project overview

GujRERA · Registration filing
Project name
Radiance Residency
Units
123 units
Mix
123 × Residential & Commercial
Carpet area
11–100 sq mper-unit range, as filed
Parking
96 spaces
Land area
3,391 sq m

Timeline

Project startedDec 2013
RERA registeredOct 2017
Proposed completionFeb 2018
TodaySep 2026
Construction progress

100% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

123 units across 1 batch
TypeArea sq mCount
Residential & Commercial61123

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

Radhe Developers India Limited

COMPANYPromoter type
Ahmedabad, GujaratBased in
1Projects
1City
2017–2018Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Ahmedabad City
District
Ahmedabad
Pincode
380005
Address
Radiance Residency Opp SBI Banknr Motera Stadium Motera Ahmedabad
What’s nearby
SchoolsNearest school 1.4km away
HealthcareHospital 175m away · Clinic within 2km
LifestylePark 1.8km away · 5 restaurants and cafes within 1km
ShoppingSupermarket 1.6km away · Mall 639m away
Getting around
Expressway 2.9 km · Sardar Patel Ring RoadPrimary road 701 mRailway line 1.8 kmMetro station 127m away (Motera Stadium)Bus stop within 500m
Water & environment
Water body 823 mRiver 1.1 km · Sabarmati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹35.60 Cr declared to build 123 flats. What that works out to:

₹7.50 Lakh – ₹1.22 Crdeclared unit pricerange on the filing — not a live asking price
₹28.94 Lakhdeclared cost per flatall-in — land + construction
16%of the cost is land₹1,596/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

₹7,860per sq yd
₹9,400per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for “MOTERA”.
In force
2011 schedule
Spread
₹5,226₹14,632 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

GujRERA · Approved building plan

Ahmedabad Municipal Corporation

Municipal / Corporation
Building Permitapproved 3 Oct 2017 · 8 yrs ago

The promised possession date (28 Feb 2018) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Ahmedabad Municipal Corporation

Municipal Corporation

Has approved 3,250 RERA projectsabout 1 in 5 in Gujarat, more than any other body in the state.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
2,712
On record
4,25,177 flats · 633 plots
Reach
6 talukas
Since
2007

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by GujRERA

07

Other projects nearby

The register · within 25 km

2,715 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,078 projects the radar draws within 6 km — every kind, every stage — 423 are residential projects still under way. This list keeps only those, and looks further out.

8 projects within 1 km — showing the nearest 6.

150 m awayResidential/Group Housing

SHIVANSH PARMANAND

SHIV INFRA · Ahmedabad City

Jun 2025registered
Dec 2029target completion
Price band₹70.00 Lakh–₹80.00 LakhScale80 flatsAuthorityGujRERA
240 m awayResidential/Group Housing

Ratnanjali Elysium

RATNANJALI AURA LLP · Ahmedabad City

Apr 2026registered
Mar 2030target completion
Price band₹74.56 Lakh–₹98.70 LakhScale63 flatsAuthorityGujRERA
310 m awayMixed Development

Vrundavan Zion

SHREE SADHIKRUPA SKY LLP · Ahmedabad City

Jun 2024registered
Mar 2027target completion
Price band₹20.00 Lakh–₹1.50 CrScale126 flatsAuthorityGujRERA
350 m awayResidential/Group Housing

EWS 57

AHMEDABAD MUNICIPAL CORPORATION · Ahmedabad City

Nov 2024registered
Oct 2026target completion
Price band₹3.00 Lakh–₹3.00 LakhScale56 flatsAuthorityGujRERA
520 m awayMixed Development

ANUVRAT ABODE

HIMALAYA UTSAV · Ahmedabad City

Jun 2024registered
Dec 2027target completion
Price band₹55.00 Lakh–₹2.40 CrScale49 flatsAuthorityGujRERA
800 m awayResidential/Group Housing

KALPAVATIKA

SAMSARA BUILDTECH PRIVATE LIMITED · Ahmedabad City

Sep 2024registered
Dec 2027target completion
Price band₹60.25 Lakh–₹1.26 CrScale192 flatsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.