Registration for Proposed Construction of High Rise (Affordable Residential Houses) Group Development Consists of Combined Extended double Basement Floors With Block-01 (TOWER A) and Block - 02. Block-01 - (TOWER A) Stilt Floor to 35 Floors with 315 Dwelling Units Block-02 Club House : Ground Floor + First Floor with swimming pool @ Ground level ,comprised in S.NO. 585/1A2A1, 586/1A, 586/2A, 586/2B, 586/2C, 587, 595/1B1A, 596/1A, 598/1 at Padur Village, Thiruporur Taluk, Chengalpattu District.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
TNRERA · Registration filing
What’s nearby
Schools1 school within 500m
HealthcareHospital 386m away · Clinic within 2km
LifestylePark 1.3km away · 4 restaurants and cafes within 1km
Primary road 151 m · Vandalur - Mambakkam - Kelambakkam RoadNo metro or railway within 5kmBus stop within 1km
Water & environment
Water body 1.1 km · Padur Lake
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Tamil Nadu registration department
In Tamil Nadu it’s called the guideline value.
No government guidance rate is shown for this project.
Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
TNRERA · Approved building plan
Town & Country Planning (DTCP)
Town & Country Planning (DTCP)
approved 24 Apr 2025 · 1 yr ago
Planning Permission no. SWP/B
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan SWP/B on the approving authority’s portal to confirm the approval.
The approving body, at scale
Town & Country Planning (DTCP)
Town & country planning
Has approved 756 RERA projects — about 1 in 5 in Tamil Nadu.
Builders
467
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. TNRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to TNRERA
Litigation
None declared in this filing
Only what the builder declared, or what TNRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with TNRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
239 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 33 projects the radar draws within 6 km — every kind, every stage — 31 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.
3 projects within 1 km — showing the nearest 3.
10 m away
RLD ALTIMA
ROYAL LAND & DEVELOPERS PRIVATE LIMITED Rep by its Director Thiru.B.Vikaram Kumar Bagmar