HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

SALISBURY TOWERS

P52100003712 · MahaRERA · https://gethorizon.in/projects/salisbury-towers-gultekadi-haveli-wxkl46fu

01

Complete project overview

MahaRERA · Registration filing
Project name
SALISBURY TOWERS
Units
26 units
Mix
19 × 4 BHK · 5 × 3 BHK · 1 × Ph 1 · 1 × Ph 2
Carpet area
196–224 sq mper-unit range, as filed
Floors
16
Land area
3,187 sq m
Sanctioned built-up
3,035 sq m
Recreational open space
276 sq m

Timeline

RERA registeredAug 2017
Proposed completionJun 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

26 units across 8 batches
TypeArea sq mCount
4 BHK2227
3 BHK1961
4 BHK22210
3 BHK1972
4 BHK2242
Ph 12221
3 BHK1972
Ph 22221

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

ATUR INDIA PRIVATE LIMITED

CompanyPromoter type
Pune, MAHARASHTRABased in
2Projects
1City
2017–2022Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
74 homeson the public record across 2 projects
6,544 sq mbuilt-up filed
4,240 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from ATUR INDIA PRIVATE LIMITED— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 155 new projects last year
  • 1,654 nearby projects
1 km radius · coordinates as filed · 19.0521, 72.9007 · © OpenStreetMap contributors
Village
Gultekadi
Taluka
Haveli
District
Pune
Pincode
411037
Survey no.
SURVEY NO 548/1A, CTS NO 55/3/3, FINAL PLOT NO 454/3
North boundary
By CTS No 55 PART 2A
East boundary
By 40 Scheme Road
South boundary
By 50 Salisbury Park Road
West boundary
By Final Plot Nos 454 PART1 AND 454 PART 2
What’s nearby
Schools2 schools within 500m · Library 1.6km away
HealthcareHospital 153m away · 11 clinics within 1km · Pharmacy within 1km
LifestylePark 987m away · Gym or sports centre 615m away · 26+ restaurants and cafes within 1km
ShoppingSupermarket 521m away · Mall 1.2km away · Bank 48m away
Getting around
Expressway 8 mPrimary road 2.1 km · Sewri-Chembur RoadRailway line 1.1 km · Central Railway (Harbour Line)Metro station 130m away (Diamond Garden)2 bus stops within 500m
Water & environment
Water body 713 m · Ganesh Talav
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹87,793per sq yd
₹1,05,000per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Gultekadi”.
In force
2026-2027 schedule
Spread
₹47,877₹99,875 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

4,331 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,654 projects the radar draws within 6 km — every kind, every stage — 480 are residential projects still under way. This list keeps only those, and looks further out.

57 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

Pardis Chitragandha

Pardis Construction LLP · Greater Mumbai · Mumbai

Jan 2025registered
Dec 2028target completion
Scale23 flatsAuthorityMahaRERA
30 m awayResidential / Group Housing

One Meraki Wing C and Wing D

Meraki Habitats LLP · Chembur · Kurla

May 2023registered
Dec 2026target completion
Government Guidance Rate₹1,04,650/sq ydScale139 flatsAuthorityMahaRERA
120 m awayResidential / Group Housing

INSIGNIA

Two Taurus Realty LLP · Chembur · Kurla

Jan 2024registered
Dec 2026target completion
Scale20 flatsAuthorityMahaRERA
170 m awayResidential / Group Housing

Vasudha

HARITA DEVELOPERS · Chembur · Kurla

May 2026registered
Dec 2028target completion
AuthorityMahaRERA
180 m awayResidential / Group Housing

RADHA CONTINENTAL

SACVIR DIMENSIONS LLP · Kurla

Feb 2023registered
Oct 2027target completion
Scale21 flatsAuthorityMahaRERA
240 m awayResidential / Group Housing

YESHWANT

SHREE KRISHNA HOMES PVT LTD · Chembur · Kurla

May 2024registered
Dec 2026target completion
Government Guidance Rate₹1,70,328/sq ydScale9 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/salisbury-towers-gultekadi-haveli-wxkl46fu.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.