Timeline

Project startedDec 2022
RERA registeredMar 2023
Proposed completionDec 2026
TodayJul 2026
Construction progress

0% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your plot

Filed by type and size, in the batches the promoter registered — not a per-plot listing. Look yours up.

58 plots across 1 batch
TypeArea sq mCount
Plotting8958

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Promoter registration

NILESHNARANBHAIPATEL & Others

OtherPromoter type
Bhavnagar, GujaratBased in
1Projects
1City
2023–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Bhavnagar
District
Bhavnagar
Address
PLOT NO.1 TO 58, R.SUR NO.69/1, O.P.NO.20, F.P.NO.20, T.P.SCHEME NO.12,
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.3km away · Clinic within 2km · Doctor's clinic within 1km
LifestylePark 1.6km away · Gym or sports centre 940m away
ShoppingSupermarket 2.0km away
Getting around
Expressway 1.1 km · Talaja Jakatnaka to Shivaji Circle RoadPrimary road 238 m · Top3 - Gogha Road - Airport RoadRailway line 4.2 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 1.1 km · Tarasmiya LakeRiver 1.7 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹1.56 Cr declared to build 58 plots. What that works out to:

₹3.12 Lakh – ₹11.05 Lakhdeclared unit pricerange on the filing — not a live asking price
₹2.69 Lakhdeclared cost per plotall-in — land + construction
₹211/sq ftof plotted area₹2,271/sq m
14%of the cost is land₹29/sq ft of land

This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Planning authority

GujRERA · Approved building plan

Others

Layout Permitapproved 15 Mar 2023 · 3 yrs ago
Building-Use (BU) permission — the occupancy sign-off, on record

All 1 block carry a Building-Use (BU) permission (latest 9 May 2023)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.

The approving body, at scale

The approving authority

The body that sanctioned this project. It has approved 2,653 RERA projects across 26 talukas about 1 in 6 in Gujarat.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — GujRERA does not publish a complaints register. This read cannot speak to them either way.