Shree Ashtavinayak

P52000080378 · MahaRERA · https://gethorizon.in/projects/shree-ashtavinayak-devad-panvel-ym50rk4k

01

Complete project overview

MahaRERA · Registration filing
Units
42 units
Mix
24 × 1 BHK · 14 × 1 RK · 4 × 2 BHK
Carpet area
20–42 sq mper-unit range, as filed
Floors
6
Buildings
2
Parking
14 spaces
Land area
1,140 sq m
Sanctioned built-up
1,823 sq m

Timeline

RERA registeredMay 2025
Proposed completionJun 2027
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Water conservation…0%
Electrical meter r…0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

42 units across 26 batches
TypeArea sq mCount
1 RK211
1 BHK301
1 BHK301
1 BHK312
1 BHK312
1 BHK311
1 BHK311
1 BHK301
1 BHK302
1 BHK271
1 RK201
1 RK211
1 BHK272
1 BHK311
1 RK213
1 RK211
1 RK203
1 BHK301
1 BHK301
1 BHK301
1 BHK301
1 BHK291
2 BHK424
1 RK214
1 BHK303
1 BHK291

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Infiniti Developers

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Devad
Taluka
Panvel
District
Raigarh
Pincode
410206
Survey no.
Survey No. 3/0
North boundary
3 Meter Wide Road
East boundary
Gut No 4
South boundary
Gut No 5
West boundary
Gut No 2
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 476m away · Clinic within 2km
LifestylePark 1.7km away · Gym or sports centre 645m away · 6 restaurants and cafes within 1km
ShoppingSupermarket 1.4km away · Mall 1.4km away · Bank 256m away
Getting around
Expressway 1.8 km · Panvel Flyover RampPrimary road 1.2 km · Matheran RoadRailway line 747 mRailway station 1.1km away (Panvel)Bus stop within 1km
Water & environment
Water body 471 mRiver 520 m · Kalundre River
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹49,582per sq yd
₹59,300per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Devad”.
In force
2026-2027 schedule
Spread
₹43,729₹50,837 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Navi Mumbai Airport Influence Notified Area (Naina)

Building Permit
Survey no. Survey No. 3/0
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Navi Mumbai Airport Influence Notified Area (Naina)

Planning authority

Has approved 22 RERA projects0.1% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
21
On record
284 flats · 0 plots
Since
2021

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

2,215 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,729 projects the radar draws within 6 km — every kind, every stage — 404 are residential projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

VichumbeResidential / Group Housing

SHREE SAMARTH VASTU

NEEL VASTU BUILDERS AND DEVELOPERS

May 2026registered
Mar 2029target completion
Government Guidance Rate₹50,251/sq ydScale45 flatsAuthorityMahaRERA
Usarli KhResidential / Group Housing

Om Shakti Complex

Unmesh House Makers

Mar 2026registered
Mar 2028target completion
Government Guidance Rate₹52,342/sq ydScale38 flatsAuthorityMahaRERA
New PanvelResidential / Group Housing

Vidyut Co-operative Housing Society Ltd

J.B. Construction

Sep 2025registered
Aug 2028target completion
Scale24 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.