This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
UNITED GARDEN
Units
59 units
Mix
44 × 1 BHK · 15 × Shop
Carpet area
13–54 sq mper-unit range, as filed
Floors
6
Parking
1 spaces
Land area
480 sq m
Sanctioned built-up
719 sq m
Timeline
RERA registeredDec 2020
Proposed completionJun 2023
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
59 units across 22 batches
TypeArea sq mCount
Shop131
Shop161
1 BHK324
Shop231
Shop191
Shop191
1 BHK374
1 BHK344
Shop171
Shop161
Shop211
Shop171
1 BHK344
Shop232
1 BHK544
1 BHK374
1 BHK534
Shop231
Shop171
Shop151
Shop221
1 BHK3316
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
356 homes · 57 plotson the public record across 9 projects
19,523 sq mbuilt-up filed
7,600 sq mplotted area
30,924 sq mland declared
₹95.41 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Group Grampanchayat VichumbeGram Panchayatthis project1 of 3 projects
Surat Municipal CorporationMunicipal / Corporation1 of 3 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 1.9 kmPrimary road 1.4 km · Matheran RoadRailway line 1.0 km · Konkan RailwayRailway station 1.6km away (Panvel)Limited bus connectivity nearby
Water & environment
River 852 m · Kalundre RiverWater body 970 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹50,251per sq yd
₹60,100per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Vichumbe”.
In force
2026-2027 schedule
Spread
₹43,144 – ₹51,338 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Group Grampanchayat Vichumbe
Gram Panchayat
Building Permit
Survey no. SURVEY NO -54 /1A AND 29 /0
The promised possession date (30 Jun 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
2 complaints · 2 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,154 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,654 projects the radar draws within 6 km — every kind, every stage — 387 are residential projects still under way. This list keeps only those, and looks further out.
4 projects within 1 km — showing the nearest 4.
380 m awayResidential / Group Housing
SHREE SAMARTH VASTU
NEEL VASTU BUILDERS AND DEVELOPERS · Vichumbe · Panvel
2 yr 10 mo
May 2026registered
Mar 2029target completion
Government Guidance Rate₹50,251/sq ydScale45 flatsAuthorityMahaRERA