Yes — registered under affordable housingprice caps & eligibility apply
Timeline
Project startedJun 2015
RERA registeredFeb 2019
Proposed completionApr 2023
TodaySep 2026
Construction progress
100% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
265 units across 2 batches
TypeArea sq mCount
Residential34247
Shop1718
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
opp old water tank, arsodiya roadRailway west, kalol
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 689m away · 2 clinics within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 949m away
Getting around
Primary road 901 m · Mansa RoadRailway line 839 mRailway station 806m away (Kalol Junction)Limited bus connectivity nearby
Water & environment
Water body 1.6 kmCanal 3.1 km
distances only — not a flood assessment
Land, title & encumbrance
Mortgage19 unit(s) mortgaged to The Kalol Nagrik Sahkari Bank · ₹20.0 Lakh outstanding
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹15.20 Cr declared to build 265 flats. What that works out to:
₹5.00 Lakh – ₹15.50 Lakhdeclared unit pricerange on the filing — not a live asking price
₹5.73 Lakhdeclared cost per flatall-in — land + construction
4%of the cost is land₹121/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood on the plot in 2016 (about 18 m), 16 m in 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is the plot the promoter drew.
Satellite photographs of the same ground
Mar 2017Mar 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2016 — and something already stood here in 2016, so this may be a redevelopment.
Plot outline was drawn by the promoter on the RERA portal and can be misplaced - check it against the image.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹7,525per sq yd
₹9,000per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for the village of “KALOL”.
In force
2011 schedule
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
06
Planning authority
GujRERA · Approved building plan
Ahmedabad Urban Development Authority
Urban Development Authority
Building Permitapproved 6 Feb 2019 · 7 yrs ago
The promised possession date (20 Apr 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Ahmedabad Urban Development Authority
Urban Development Authority
Has approved 2,400 RERA projects — about 1 in 7 in Gujarat.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
1,936
On record
3,12,468 flats · 1,153 plots
Reach
22 talukas
Since
2007
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
Number
What
Date
GJ/CMP/SM/Gandhinagar/191003/0415
Suo-motu
3 Oct 2019
GJ/CMP/OFC/Gandhinagar/190906/000085
Complaint
6 Sep 2019
GJ/CMP/OFC/Ahmedabad/190828/000035
Complaint
29 Aug 2019
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
1,641 residential projects still under way within 25 km. Step out ring by ring:
Of the 129 projects the radar draws within 6 km — every kind, every stage — 45 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011.
06Planning authority
GujRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
Complaints on GujRERA's register.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/siddhraj-homes-kalol-fejpi373.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.