HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

SLV PNB ELITE

P06160146647 · RERA Andhra Pradesh · https://gethorizon.in/projects/slv-pnb-elite-ramavarappadu-vijayawada-rural-07hknwsh

01

Complete project overview

RERA Andhra Pradesh · Registration filing
Units
55 flats
Unit mix
55 × 2BHK
Carpet area
75–79 sq m
Floors
5
Land area
2,000 sq m
Built-up area
6,973 sq m

Timeline

Project startedApr 2026
RERA approvedMay 2026
Proposed completionApr 2029
TodaySep 2026

Find your flat

Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.

UnitTypeCarpet sq mBalcony sq mOuter wall sq mCommon sq mTotal sq mParking sq m
101GROUND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
102GROUND FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
103GROUND FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29
104GROUND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
105GROUND FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
106GROUND FLOOR · A-BLOCK2BHK75.663.238.1425.94122.269.29
107GROUND FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
108GROUND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
109GROUND FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29
110GROUND FLOOR · A-BLOCK2BHK75.663.238.1425.94122.269.29
111GROUND FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
201FIRST FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
202FIRST FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
203FIRST FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29
204FIRST FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
205FIRST FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
206FIRST FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
207FIRST FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
208FIRST FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
209FIRST FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29
210FIRST FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
211FIRST FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
301SECOND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
302SECOND FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
303SECOND FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29
304SECOND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
305SECOND FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
306SECOND FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
307SECOND FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
308SECOND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
309SECOND FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29
310SECOND FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
311SECOND FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
401THIRD FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
402THIRD FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
403THIRD FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29
404THIRD FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
405THIRD FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
406THIRD FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
407THIRD FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
408THIRD FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
409THIRD FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29
410THIRD FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
411THIRD FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
501FOURTH FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
502FOURTH FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
503FOURTH FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29
504FOURTH FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
505FOURTH FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
506FOURTH FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
507FOURTH FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
508FOURTH FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
509FOURTH FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29
510FOURTH FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
511FOURTH FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.

All 55 units as filed, two to a row · areas in sq m
UnitTypeCarpetBalconyOuter wallCommonTotalParkingUnitTypeCarpetBalconyOuter wallCommonTotalParking
101GROUND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29102GROUND FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
103GROUND FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29104GROUND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
105GROUND FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29106GROUND FLOOR · A-BLOCK2BHK75.663.238.1425.94122.269.29
107GROUND FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29108GROUND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
109GROUND FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29110GROUND FLOOR · A-BLOCK2BHK75.663.238.1425.94122.269.29
111GROUND FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29201FIRST FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
202FIRST FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29203FIRST FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29
204FIRST FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29205FIRST FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
206FIRST FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29207FIRST FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
208FIRST FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29209FIRST FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29
210FIRST FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29211FIRST FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
301SECOND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29302SECOND FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
303SECOND FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29304SECOND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
305SECOND FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29306SECOND FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
307SECOND FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29308SECOND FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
309SECOND FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29310SECOND FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
311SECOND FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29401THIRD FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
402THIRD FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29403THIRD FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29
404THIRD FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29405THIRD FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
406THIRD FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29407THIRD FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
408THIRD FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29409THIRD FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29
410THIRD FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29411THIRD FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
501FOURTH FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29502FOURTH FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29
503FOURTH FLOOR · A-BLOCK2BHK74.538.1930.25122.269.29504FOURTH FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
505FOURTH FLOOR · A-BLOCK2BHK78.638.4025.94122.269.29506FOURTH FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
507FOURTH FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29508FOURTH FLOOR · A-BLOCK2BHK78.668.3725.94122.269.29
509FOURTH FLOOR · A-BLOCK2BHK74.568.1630.25122.269.29510FOURTH FLOOR · A-BLOCK2BHK75.668.1429.17122.269.29
511FOURTH FLOOR · A-BLOCK2BHK76.552.398.0925.94122.269.29
02

Builder’s track record

RERA Andhra Pradesh · Builder registration

SLV INFRA PRIVATE LIMITED

CompanyPromoter type
KrishnaBased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Andhra Pradesh · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 75 new projects last year
  • 424 nearby projects
1 km radius · coordinates as filed · 16.5297, 80.6790 · © OpenStreetMap contributors
Village
RAMAVARAPPADU
Mandal
Vijayawada Rural
District
Krishna
Pincode
521108
What’s nearby
Schools1 school within 1km · College or university 1.1km away
HealthcareHospital 1.1km away
LifestylePark 1.3km away
ShoppingSupermarket 1.3km away · Mall 1.9km away
Getting around
Expressway 560 m · Nehru Inner Ring RoadPrimary road 259 m · Nehru Inner Ring RoadRailway line 416 mRailway station 455m away (Ramavarappadu)Bus stop within 1km
Water & environment
Canal 311 m · BudameruWater body 671 m
distances only — not a flood assessment
Government land classification

Land here includes House Sites (residential), plus Agricultural Land fit for H.S., Land abutting NH/SH/ZPP/MPP. The state classes land per survey— confirm your plot’s survey number is House Sites.

AP Registration & Stamps
Declared external development
Roads0%
Water supply0%
Sewage0%
Electricity0%
Solid waste0%
Fire safety0%
Water0%
Emergency exits0%
Renewable energy0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisdeclared build cost — not a sale price

₹16.17 Cr declared to build 55 flats. What that works out to:

₹29.41 Lakhdeclared cost per flatall-in — land + construction
₹2,155/sq ftof built-up area₹23,195/sq m
7%of the cost is land₹534/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

The yearly satellite view ends in 2023 and this project started in 2026, so it does not cover this project's construction: the site was still open ground within ~25 m of the recorded location when the series ends. The 2026 image shows the site more recently.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~25 m of the filed location.

Satellite photographs of the same ground

Feb 2017
Apr 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • This series ends in 2023, before this project’s construction — so it shows what stood here before, and says nothing about whether building has since begun. The photograph does that.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~25 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • The yearly site view ends in 2023, before this project started in 2026.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

AP Registration & Stamps

In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.

₹44,000per sq yd
₹52,624per sq m
Which rate
residential (urban)
Matched to
The rate published for the village of “RAMAVARAPPADU”.
In force
effective Feb 2025

What this number is — and isn’t

  • The minimum value Andhra Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
06

Planning authority

RERA Andhra Pradesh · Approved building plan

Commissioner, APCRDA

Municipal / Corporation · Vijayawada
approved 23 Apr 2026 · 5 mo ago
Building Permit no. PER/1168/0281/2026Survey no. 76/2
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan PER/1168/0281/2026 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Vijayawada

AP Capital Region Development Authority

Has approved 828 RERA projectsabout 1 in 8 in Andhra Pradesh.

an apartments market75% apartments · 25% plotted layouts. Apartments like yours are this body's core business.

Builders
595
On record
22,960 flats · 24,454 plots
Reach
25 mandals
Since
2012

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Andhra Pradesh

08

Other projects nearby

The register · within 25 km

325 residential projects still under way within 25 km. Step out ring by ring:

Of the 424 projects the radar draws within 6 km — every kind, every stage — 174 are residential projects still under way. This list keeps only those, and looks further out.

5 projects within 1 km — showing the nearest 5.

230 m awayResidential

SLV TOWERS

SLV INFRA · RAMAVARAPPADU · Vijayawada Rural

Oct 2025registered
Jan 2028target completion
Declared cost₹2.65 CrScale10 flatsAuthorityRERA Andhra Pradesh
620 m awayMixed Development

ROYAL RIGHTWAY HOMES

RR INFRA PROJECTS · RAMAVARAPPADU · Vijayawada Rural

Mar 2024registered
Jan 2027target completion
Declared cost₹22.63 CrScale71 flatsAuthorityRERA Andhra Pradesh
720 m awayResidential

SLV GREEN MEADOWS

SRI LAKSHMI VENKATESWARA BUILDERS · RAMAVARAPPADU · Vijayawada Rural

Mar 2022registered
Oct 2027target completion
Declared cost₹358.37 CrAuthorityRERA Andhra Pradesh
750 m awayResidential

SLV AMARAVATI GRAND II

SRI LAKSHMI VENKATESWARA DEVELOPERS · RAMAVARAPPADU · Vijayawada Rural

Dec 2021registered
Nov 2027target completion
Declared cost₹107.49 CrScale165 flatsAuthorityRERA Andhra Pradesh
920 m awayResidential

VENKATADRI KRISHNA TOWERS

RAINBOW NIRMAN · RAMAVARAPPADU · Vijayawada Rural

May 2026registered
Mar 2029target completion
Declared cost₹4.61 CrScale10 flatsAuthorityRERA Andhra Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Andhra Pradesh does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Andhra Pradesh does not publish a complaints register. This read cannot speak to them either way.
  • Escrow — RERA Andhra Pradesh does not publish escrow declarations. Whether buyer money is ring-fenced cannot be read here.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with RERA Andhra Pradesh, as the builder submitted it.
  2. 02Builder's track record
    • RERA Andhra Pradesh: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location & price analysis
    • Address, pincode and declared cost: the RERA Andhra Pradesh filing.
    • Coordinates: as filed with RERA Andhra Pradesh.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Land classification: AP Registration & Stamps.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • AP Registration & Stamps.
  6. 06Planning authority
    • RERA Andhra Pradesh: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • RERA Andhra Pradesh's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/slv-pnb-elite-ramavarappadu-vijayawada-rural-07hknwsh.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.