WELLINGTON VILLAGE

TNRERA/11/BLG/0308/2025 · TNRERA · https://gethorizon.in/projects/wellington-village-bst33uq7

01

Complete project overview

TNRERA · Registration filing
Description
Registration for Group Development of Residential Villas consisting of 15 Blocks with Block - 1 (Villa - 01) Ground Floor + 2 Floors with 1 Dwelling Unit, Block - 2 (Villa - 02) Ground Floor + 2 Floors with 1 Dwelling Unit, Block - 3 (Villa - 03) Ground Floor + 2 Floors with 1 Dwelling Units, Block - 4 (Villa - 04, 05, 06, 07, 08, 09, 10) Ground Floor + 2 Floors with 7 Dwelling Units, Block - 5 (Typical Villa - 11, 12, 13) Ground Floor + 2 Floors with 3 Dwelling Units, Block - 6 (Typical Villa - 14, 15, 16, 17, 18) Ground Floor + 2 Floors with 5 Dwelling Units, Block - 7 (Typical Villa - 19, 20, 21) Ground Floor + 2 Floors with 3 Dwelling Units, Block - 8 (Typical Villa - 22, 23) Ground Floor + 2 Floors with 2 Dwelling Units, Block - 9 (Typical Villa - 23, 24, 25, 26, 27) Ground Floor + 2 Floors with 5 Dwelling Units, Block - 10 (Typical Villa - 28, 29 ,30, 31, 32) Ground Floor + 2 Floors with 5 Dwelling Units, Block - 11 (Villa - 34) Ground Floor + 2 Floors with 1 Dwelling Units, Block - 12 (Typical Villa - 35, 36, 37, 38) Ground Floor + 2 Floors with 4 Dwelling Units, Block - 13 (Typical Villa - 39) Ground Floor + 2 Floors with 1 Dwelling Units, Block - 14 (Typical Villa - 40, 41, 42, 43, 44, 45, 46, 47) Ground Floor + 2 Floors with 8 Dwelling Units, Block - 15 (Amenity Block) Ground Floor + First Floor Totally 47 Villas + Amenity Block at Survey Nos. 194/A1, 195/2A, 4B, 4D, 194/A2, 195/4C, 195/4A of Kalapatty West Village, Coimbatore North Taluk, Coimbatore District.
Registration no.
TNRERA/11/BLG/0308/2025

Timeline

RERA registeredSep 2025
Proposed completionDec 2030
TodaySep 2026
02

Builder’s track record

TNRERA · Builder registration

PARS ENGINEERING INDIA PRIVATE LIMITED

PARS ENGINEERING INDIA PRIVATE LIMITEDPromoter
1Projects
1Cities
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

TNRERA · Registration filing
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 792m away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 2.8 km · Sathyamangalam RoadPrimary road 903 m · Sitra - Kurumbapalayam RoadNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 606 m
distances only — not a flood assessment
04

Government Guidance Rate

Tamil Nadu registration department

In Tamil Nadu it’s called the guideline value.

No government guidance rate is shown for this project.

Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

TNRERA · Approved building plan

Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
Planning Permissionapproved 17 Sep 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Town & Country Planning (DTCP)

Town & country planning

Has approved 756 RERA projectsabout 1 in 5 in Tamil Nadu.

Builders
467
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by TNRERA

07

Other projects nearby

The register · within 25 km

120 residential and mixed-use projects still under way within 25 km. Step out ring by ring:

Of the 43 projects the radar draws within 6 km — every kind, every stage — 40 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

780 m away

CAPITAL CITY

TNCD LLP

Mar 2025registered
Jan 2030target completion
AuthorityTNRERA
790 m away

CENTRAL CITY

TNCD LLP

May 2026registered
Apr 2031target completion
AuthorityTNRERA
810 m away

LAVENDER

Greenfield Housing India Private Limited

Apr 2025registered
Nov 2029target completion
AuthorityTNRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — TNRERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — TNRERA does not publish a complaints register. This read cannot speak to them either way.
  • Escrow — TNRERA does not publish escrow declarations. Whether buyer money is ring-fenced cannot be read here.