HORIZON
Share

Yashashree Arcade

P51700049139 · MahaRERA · https://gethorizon.in/projects/yashashree-arcade-dombivli-kalyan-yctn59ae

01

Complete project overview

MahaRERA · Registration filing
Units
21 units
Floors
8
Buildings
2
Parking
9 spaces
Land area
601 sq m
Sanctioned built-up
1,258 sq m

Timeline

RERA registeredFeb 2023
Proposed completionDec 2025
TodaySep 2026
Construction progress
Podiums0%
Flat fit-out0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Stairs & lifts50%
External finishes50%
Internal finishes85%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Superstructure100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

YASHASHREE CONSTRUCTIONS

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2023–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
DOMBIVLI
Taluka
Kalyan
District
Thane
Pincode
421201
Survey no.
PLOT CTS NO 3241 TO 3245
North boundary
NEW AYRE ROAD
East boundary
NEW RAJGANGA SOCIETY
South boundary
GAUTAM MAHADU BHAGAT BUILDING
West boundary
NEW AYRE ROAD
What’s nearby
Schools1 school within 500m · 4 educational institutions within 1km
HealthcareHospital 481m away · 7 clinics within 1km · Pharmacy within 1km
LifestylePark 701m away · Gym or sports centre 685m away · 4 restaurants and cafes within 1km
ShoppingSupermarket 1.2km away · Bank 111m away
Getting around
Expressway 4.8 km · Kalyan Bhiwandi RoadPrimary road 2.1 km · Kalyan - Shil RoadRailway line 309 mRailway station 641m away (Kopar)Limited bus connectivity nearby
Water & environment
River 469 mWater body 486 m · Public Water Tank
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹64,298per sq yd
₹76,900per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “DOMBIVLI”.
In force
2026-2027 schedule
Spread
₹50,753₹65,134 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Kalyan Dombivli Municipal Corporation

Municipal Corporation
Building Permit
Survey no. PLOT CTS NO 3241 TO 3245

The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Kalyan Dombivli Municipal Corporation

Municipal corporation

Has approved 742 RERA projects3.7% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
585
On record
5,683 flats · 0 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,734 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,199 projects the radar draws within 6 km — every kind, every stage — 498 are residential projects still under way. This list keeps only those, and looks further out.

58 projects within 1 km — showing the nearest 6.

Kalyan-DombivaliResidential / Group Housing

SUMATI SKYLINE

SUBHASH SKYLINE INFRA

Sep 2023registered
Sep 2026target completion
Government Guidance Rate₹49,415/sq ydScale40 flatsAuthorityMahaRERA
Kalyan-DombivaliResidential / Group Housing

Harisha

Omkar Manik Mhatre

Mar 2025registered
Jun 2028target completion
Government Guidance Rate₹49,415/sq ydScale8 flatsAuthorityMahaRERA
DOMBIVLIResidential / Group Housing

SAPTASHRUNGI

PADMAVATI BUILDERS

Mar 2022registered
Dec 2026target completion
Government Guidance Rate₹64,298/sq ydScale49 flatsAuthorityMahaRERA
Ayre DombiviliMixed

Yashogad Pride

M/s APR Realty

Apr 2026registered
Jan 2029target completion
Scale22 flatsAuthorityMahaRERA
DOMBIVLIResidential / Group Housing

Yashogiri

Pacific Innovations LLP

May 2026registered
Mar 2029target completion
Government Guidance Rate₹64,298/sq ydScale32 flatsAuthorityMahaRERA
DOMBIVLIResidential / Group Housing

MAITRI NAVKAR

NAVKAR SHELTERS

Jul 2023registered
Dec 2027target completion
Government Guidance Rate₹64,298/sq ydScale99 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.