01
Complete project overview
GujRERA · Registration filing
Project name
Zyva Residency
Units
248 units
Mix
226 × Residential · 22 × Shop
Carpet area
25–83 sq mper-unit range, as filed
Blocks
5
Parking
456 spaces
Timeline
Project startedJan 2024
RERA registeredAug 2025
Proposed completionDec 2029
TodaySep 2026
Construction progress
15% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
248 units across 2 batches
TypeArea sq mCount
Shop3122
Residential67226
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
337 homes · 145 plotson the public record across 9 projects
37,443 sq mbuilt-up filed
6,366 sq mland declared
₹42.27 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Ahmedabad Municipal CorporationMunicipal / Corporationthis project1 of 4 projects
Bhavnagar Municipal CorporationMunicipal / Corporation1 of 4 projects
BhopalTown & Country Planning (DTCP)1 of 4 projects
Panvel Municipal CorporationMunicipal Corporation1 of 4 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
FINAL PLOT NO.: 02+105/1+10/1+18, OF TP SCHEME NO.: 85(VATVA -5),
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 618m away · 3 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 2.0km away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.6 km · FlyoverPrimary road 541 mRailway line 2.4 kmRailway station 2.5km away (Vatva)Limited bus connectivity nearby
Water & environment
Canal 143 mWater body 744 m
distances only — not a flood assessment
Price analysisdeclared unit prices — not a live asking price
The unit prices the builder filed with the authority:
₹10.70 Lakh – ₹24.00 Lakhdeclared unit pricerange on the filing — not a live asking price
The unit prices as filed with the authority — not a live asking price. What a unit actually sells for, and any premium, sits above this and can move after the filing.
Location & price analysis — done
04
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹6,104per sq yd
₹7,300per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for the village of “VATVA - 5- DRAFT SUBMITTED T.P.S NO - 85”.
In force
2011 schedule
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
GujRERA · Approved building plan
Ahmedabad Municipal Corporation
Municipal / Corporation
Building Permitapproved 11 Aug 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Ahmedabad Municipal Corporation
Municipal Corporation
Has approved 3,250 RERA projects — about 1 in 5 in Gujarat, more than any other body in the state.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
2,712
On record
4,25,177 flats · 633 plots
Reach
6 talukas
Since
2007
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,368 residential projects still under way within 25 km. Step out ring by ring:
Of the 745 projects the radar draws within 6 km — every kind, every stage — 277 are residential projects still under way. This list keeps only those, and looks further out.