HORIZON
Share

49 ELINA

P51800009485 · MahaRERA · https://gethorizon.in/projects/49-elina-kurla-cz0fob5n

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
49 ELINA
Units
63 units
Mix
25 × 3 BHK · 24 × 2 BHK · 14 × 1 BHK
Carpet area
46–92 sq mper-unit range, as filed
Floors
16
Parking
49 spaces
Land area
1,452 sq m
Sanctioned built-up
6,911 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2019
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

63 units across 8 batches
TypeArea sq mCount
1 BHK461
1 BHK503
2 BHK7611
3 BHK9225
1 BHK503
1 BHK493
1 BHK494
2 BHK6613

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

HUGES REAL ESTATES DEVELOPERS LLP

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2017–2019Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400089
Survey no.
35
North boundary
LAYOUT ROAD
East boundary
LAYOUT ROAD
South boundary
BLDG NO 48
West boundary
BLDG NO 50
What’s nearby
SchoolsNearest school 1.3km away · Library 1.2km away
HealthcareHospital 572m away · 4 clinics within 1km · Pharmacy within 1km
LifestylePark 805m away · Gym or sports centre 767m away · 10+ restaurants and cafes within 1km
ShoppingSupermarket 657m away · Convenience store within 1km · Bank 689m away
Getting around
Expressway 102 m · Santa Cruz – Chembur Link RoadPrimary road 2.0 km · Lal Bahadur Shastri MargRailway line 435 mRailway station 350m away (Tilak Nagar)2 bus stops within 500m
Water & environment
Water body 674 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

4,366 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,953 projects the radar draws within 6 km — every kind, every stage — 610 are residential projects still under way. This list keeps only those, and looks further out.

37 projects within 1 km — showing the nearest 6.

70 m awayResidential / Group Housing

Bhakti Pride

Bhakti Homes · Chembur · Kurla

Mar 2025registered
Dec 2027target completion
Government Guidance Rate₹1,04,432/sq ydScale71 flatsAuthorityMahaRERA
140 m awayOthers

SILICON HOFE B WING

SHILPRIYA BUILDERS AND DEVELOPERS · Chembur · Kurla

Feb 2024registered
Jul 2026target completion
Government Guidance Rate₹1,37,627/sq ydScale72 flatsAuthorityMahaRERA
160 m awayResidential / Group Housing

25 Downtown-Wing 4-Ruby Mount

TWENTY FIVE DOWNTOWN REALTY LIMITED · Mumbai City

Oct 2025registered
Dec 2035target completion
Scale2 flatsAuthorityMahaRERA
260 m awayOthers

ELYSIUM

KRIPA ELITE HOMES · Greater Mumbai · Mumbai

Feb 2024registered
Dec 2027target completion
Scale200 flatsAuthorityMahaRERA
340 m awayResidential / Group Housing

ATHARVA VAIBHAV

ATHARVA DEVELOPERS · Greater Mumbai · Mumbai

Dec 2024registered
Dec 2028target completion
Scale107 flatsAuthorityMahaRERA
370 m awayResidential / Group Housing

GAMI AND JAYDEEP ELORA

M/S REAL INFRASTRUCTURE CO · Chembur · Kurla

Apr 2026registered
Sep 2029target completion
Government Guidance Rate₹1,37,627/sq ydAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.