Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Greater Mumbai (M Corp.) (Part) (802794)
Taluka
Mumbai
District
Mumbai Suburban
Pincode
400024
Survey no.
229, 267
North boundary
GOVT MILK DAIRY
East boundary
BUILDING NO 134
South boundary
56 FEET WIDE ROAD
West boundary
40 FEET WIDE ROAD
What’s nearby
Schools1 school within 1km · Library 2.0km away
HealthcareHospital 430m away · 1 clinic within 1km
LifestylePark 1.5km away · Gym or sports centre 1.5km away · 4 restaurants and cafes within 1km
ShoppingSupermarket 186m away · Bank 234m away
Getting around
Expressway 451 m · Santa Cruz – Chembur Link RoadPrimary road 1.3 km · Lal Bahadur Shastri MargRailway line 357 m · Central Railway (Harbour Line)Railway station 489m away (Tilak Nagar)5 bus stops within 500m
Water & environment
Water body 48 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Maharashtra Housing and Area Development Authority (MHADA)
Housing Authority
Building Permit
Survey no. 229, 267
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Maharashtra Housing and Area Development Authority (MHADA)
Planning authority
Has approved 438 RERA projects — 2.2% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
341
On record
13,458 flats · 0 plots
Reach
18 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12401235
25 Dec 2024
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
4,246 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,388 projects the radar draws within 6 km — every kind, every stage — 767 are residential projects still under way. This list keeps only those, and looks further out.