This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
EKTA RESIDENCY
Units
117 units
Mix
110 × Residential · 7 × Shop
Carpet area
18–97 sq mper-unit range, as filed
Floors
18
Buildings
2
Parking
60 spaces
Land area
2,144 sq m
Sanctioned built-up
8,271 sq m
Recreational open space
912 sq m
Timeline
RERA registeredSep 2017
Proposed completionDec 2019
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
117 units across 13 batches
TypeArea sq mCount
Residential3047
Shop251
Shop381
Shop321
Shop181
Shop631
Shop271
Shop631
Residential741
Residential6915
Residential9715
Residential7916
Residential6516
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400089
Survey no.
PLOT NO 79 CTS 14 PT VILLAGE CHEMBUR AND CTS 508 PT VILLAGE KIROL
North boundary
15 MTRS WIDE ROAD
East boundary
13 MTRS WIDE ROAD
South boundary
BUILDING NO 77
West boundary
BUILDING NO 78
What’s nearby
SchoolsNearest school 1.2km away · Library 1.0km away
HealthcareHospital 634m away · 1 clinic within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 266m away · 5 restaurants and cafes within 1km
ShoppingSupermarket 279m away · ATM within 500m
Getting around
Expressway 588 m · Santa Cruz – Chembur Link Road FlyoverPrimary road 1.7 km · Lal Bahadur Shastri MargRailway line 280 mRailway station 455m away (Lokmanya Tilak Terminus)Bus stop within 1km
Water & environment
Water body 904 m · Trombay Creek
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
4,452 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,898 projects the radar draws within 6 km — every kind, every stage — 588 are residential projects still under way. This list keeps only those, and looks further out.