HORIZON
Share

AASTHA HOUSING

PR1262022601204 · MahaRERA · https://gethorizon.in/projects/aastha-housing-hadapsar-haveli-jeqg9665

01

Complete project overview

MahaRERA · Registration filing
Project name
AASTHA HOUSING
Units
99 units
Floors
12
Buildings
2
Parking
153 spaces
Land area
42,172 sq m
Sanctioned built-up
8,368 sq m
Recreational open space
6,932 sq m

Timeline

RERA registeredJul 2026
Proposed completionSep 2029
TodaySep 2026
Construction progress
Excavation0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Water conservation…0%
Fire protection an…0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Viraj Pramod Tupe

IndividualPromoter type
Pune, MAHARASHTRABased in
3Projects
1City
2025–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
625 homeson the public record across 3 projects
82,780 sq mbuilt-up filed
93,904 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Viraj Pramod Tupe— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Hadapsar
Taluka
Haveli
District
Pune
Pincode
411028
Survey no.
S.No. 207/1/1(P), CTS No. 4274+4300+4301(P) + S.No. 208/1A/1(P) + S. No. 208/1A/2 + S. No. 208/1A/3/1(P), CTS No. 4301+4302+4303+4271+4272+4273(P)
North boundary
Proposed 24 mtrs. road
East boundary
Adj. CTS No. 4274
South boundary
T3, T4
West boundary
Amenity Space
What’s nearby
Schools1 school within 500m · College or university 1.3km away · Library 1.3km away
HealthcareHospital 472m away · 2 clinics within 1km
LifestylePark 945m away · Gym or sports centre 1.6km away · Swimming pool within 2km
ShoppingSupermarket 1.3km away
Getting around
Expressway 1.0 km · Solapur Road FlyoverPrimary road 1.0 km · Solapur RoadRailway line 1.6 km · Pune - Daund Railway LineMetro station 2.2km away (Hadapsar)Limited bus connectivity nearby
Water & environment
Canal 259 mWater body 374 m · swimming pool
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹52,617per sq yd
₹62,930per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Hadapsar”.
In force
2026-2027 schedule
Spread
₹31,923₹87,952 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Pune Municipal Corporation

Municipal Corporation
Building Permit
Survey no. S.No. 207/1/1(P), CTS No. 4274+4300+4301(P) + S.No. 208/1A/1(P) + S. No. 208/1A/2 + S. No. 208/1A/3/1(P), CTS No. 4301+4302+4303+4271+4272+4273(P)
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Pune Municipal Corporation

Municipal corporation

Has approved 1,863 RERA projectsabout 1 in 11 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
1,351
On record
9,749 flats · 439 plots
Reach
3 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

2,882 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,118 projects the radar draws within 6 km — every kind, every stage — 419 are residential projects still under way. This list keeps only those, and looks further out.

10 projects within 1 km — showing the nearest 6.

130 m awayResidential / Group Housing

AVINEA PHASE 2

Viraj Pramod Tupe · Hadapsar · Haveli

Nov 2025registered
Dec 2029target completion
Government Guidance Rate₹52,617/sq ydScale204 flatsAuthorityMahaRERA
130 m awayResidential / Group Housing

Astrana

Dilip Baburao Tupe · Hadapsar · Haveli

Apr 2024registered
Mar 2028target completion
Government Guidance Rate₹52,617/sq ydScale400 flatsAuthorityMahaRERA
130 m awayResidential / Group Housing

STELLA

Dilip Baburao Tupe · Hadapsar · Haveli

May 2025registered
Mar 2028target completion
Government Guidance Rate₹52,617/sq ydScale78 flatsAuthorityMahaRERA
260 m awayResidential / Group Housing

AQUILA

Dilip Baburao Tupe · Hadapsar · Haveli

May 2025registered
Mar 2028target completion
Government Guidance Rate₹52,617/sq ydScale53 flatsAuthorityMahaRERA
340 m awayOthers

SILVER ASTRA

Mahavir Vishwakarma Properties LLP · Hadapsar · Haveli

Jun 2024registered
Dec 2028target completion
Government Guidance Rate₹52,617/sq ydScale144 flatsAuthorityMahaRERA
690 m awayMixed

Niwaas

KELE REALCORP PRIVATE LIMITED · Hadapsar · Haveli

Jul 2025registered
May 2027target completion
4 open complaintsGovernment Guidance Rate₹52,617/sq ydScale72 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.