HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
408 units
Mix
238 × 3BHK · 136 × 2BHK · 34 × 4BHK
Booked
400 of 408 filed sold/bookedas declared in the RERA filing
Buildings
4
Land area
16,393 sq m
Floor area
88,417 sq m
Description
ARTECH LIFESPACES

Timeline

Project startedAug 2017
RERA registeredAug 2021
Proposed completionDec 2024
TodayJul 2026
Construction progress

49% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings0%
Electrical Fittings0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Staircases, Lifts Wells10%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings15%
Overhead and Underground Water Tanks.35%
Electrical Fittings40%
The external plumbing and external plastering40%
Completion of terraces floor each building40%
Slabs of Super Structure50%
Staircases, Lifts Wells60%
Fire Fighting Fittings and Equipment60%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc60%
Sanitary Fittings65%
Basement(s) and Plinth70%
Sanitary Fittings70%
Electrical Fittings70%
Staircases, Lifts Wells70%
Overhead and Underground Water Tanks.70%
Basement(s) and Plinth75%
Basement(s) and Plinth75%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings86%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Excavation100%
Slabs of Super Structure100%
Excavation100%
Excavation100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

8 of 408 available
TypeArea sq mAvailable
2BHK680 of 34
3BHK1083 of 68
4BHK1691 of 34
3BHK1090 of 34
3BHK970 of 34
2BHK840 of 68
3BHK1270 of 34
2BHK654 of 34
3BHK960 of 34
3BHK1040 of 34

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

ARTECH REALTORS PRIVATE LIMITED

CompanyPromoter type
Thiruvananthapuram, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
17Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
1,804 homeson the public record across 17 projects
3,57,028 sq mbuilt-up filed
72,636 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Thiruvananthapuram Municipal CorporationMunicipal Corporationthis project11 of 17 projects
Kollam Municipal CorporationMunicipal Corporation2 of 17 projects
Karakulam Grama PanchayatGrama Panchayat1 of 17 projects
Thiruvalla MunicipalityMunicipality1 of 17 projects
ThiruvananthapuramLocal body (LSGI)1 of 17 projects
Trissur Municipal CorporationMunicipal Corporation1 of 17 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
KARIMANAL
Village
ATTIPRA
Taluk
THIRUVANANTHAPRUAM
District
Thiruvananthapuram
Pincode
695583
Survey no.
Re Sy 398/2, Resy 308/2-3
Patta no.
T 8551, T 18904
What’s nearby
SchoolsNo schools within 2km · Library 1.9km away · Kindergarten within 500m
HealthcareNearest hospital 2.2km away · Clinic within 2km
LifestylePark 1.2km away · 6 restaurants and cafes within 1km
ShoppingSupermarket 491m away · Convenience store within 500m · Bank 751m away
Getting around
Expressway 209 m · Salem - Kochi - Kanyakumari RoadPrimary road 3.7 kmRailway line 660 mRailway station 569m away (Veli)4 bus stops within 500m
Water & environment
River 73 mWater body 579 m · Quarry Lake
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Thiruvananthapuram Municipal Corporation

Municipal Corporation
approved 30 Oct 2019 · 6 yrs ago
Building Permit no. ZAE/BA/98/17Survey no. Re Sy 398/2, Resy 308/2-3

The promised possession date (1 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan ZAE/BA/98/17 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thiruvananthapuram Municipal Corporation

Municipal corporation / municipality

Has approved 224 RERA projectsabout 1 in 7 in Kerala, more than any other body in the state.

an apartments market91% apartments · 9% plotted layouts. Apartments like yours are this body's core business.

Builders
90
On record
12,045 flats · 635 plots
Since
2021

More apartment-heavy than Kerala overall — 91% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.